GB
United Kingdom (EU.UK)
Brian Berry
I am currently responsible for managing one of Scantec's largest clients who are based in the South East (just outside of Reading) where we currently have approximately 400 contractors placed, these range through a number of disciplines and include, but are not limited to Engineering Managers, Project Managers, Project Engineers, Construction Managers, Planning Engineers, Clerk of Works, Site Managers, Design Engineers, Requirements Engineers, Facility Engineers, Risk Managers, plus many other disciplines.
STEPHEN LOWSLEY
Associate Director at DGA (UK) Ltd. Based in the East Midlands acting as delay expert in respect of all forms of time related construction disputes.
Victor Lara
Over 5 years’ experience managing and delivering projects on both service and client side. Experience ranges from small sized projects to major CAPEX projects for refinery, chemical, naval (O&G) and renewable (wind power) industries. Having worked in a variety of environments from office based projects, shipyard and offshore locations; and having lived in different countries, I have developed excellent communication and relationship skills.
Cost & Planning Engineer, TECHNIP IBERIA, Steam Boilers Replacement (revamping)
- Estimation of Costs and Planning
- Planning Control and Making with MS Project (FEED, Detail, Construction, and Proposals).
- Progress Control (S curves)
- Cost Estimation for refinery projects and proposals.
- Mobilization Curves
- Monthly Project Reports
- Productivity Analisis
- Support to Cost Control
melissa cormack
Planing Engineer, Halliburton, OIL AND GAS VARIOUS PROJECTS (HEADOFFICE POSITION)
Halliburton - Planing engineer. Newly started on planing role and finded very interesting.
Razmik Aslanian
Planning Engineer, have in-depth knowledge of pre and post contract as well as tender planning of multi disciplined projects. Construction, Civil, Rail & London Underground.
Capable of preparing and monitoring programmes, as well as Time Location for civil and building projects, as well as Rail and London Underground
Responsible for the analysing of project resource requirements and costing as well as production of histograms and cash flow profiles, weekly progress monitoring and reporting.
Pagination
- Previous page
- Page 338
- Next page