Project Controls Engineer, Sellafield Ltd (formerly BNGrp/BNFL), Substation Replacement Project

J
Jason Mills 👤 Member for 15 years 4 months
START Date

I have experience of the full Project Controls service. Providing a planning role on a Substation replacement project, progressing own schedule and monitoring a contractors schedule.

Aslo have responsibilitiy for maintaing costs within budgeted limits. On a mnothly basis produce reports detailing Year to date BCWP / EAC and forecast BCWP / EAC for the financial year and the lifetime of the project.

Senior Project Planner, Laing O'Rourke, As Above

START Date

Laing O'Rourke Planning Experience

Sellafield EPS3 (Project Planner / Project Controls Manager)   2007 – 2009

Turnkey Nuclear Waste Repository, approximately 100m in length, 50m in width, and 24m tall.  The Repository consists of two storage vaults, a multi level maintenance area for the two remote controlled cranes, and associated building services and maintenance facilities.  Planning Software – Primavera P3 and P6 –

IEP Doncaster Tender 2009

Demolition of Existing Facilities and Enabling Works, Asbestos

Area QS, Balfour Beatty Construction, Sellafield Processing Facilty, Cumbria, UK

G
Geoff Mann 👤 Member for 22 years 4 months
START Date
END Date

Preparation and negotiation of Claims (Time and Cost); Preparation of Variation Memoranda; Subcontract procurement and claims settlement (time and cost); Estimating; Prepare and review Cost/Value KPI's and EVA reports with Regional Commercial Manager for submission to Regional Director.

Project Manager, Kidde Graviner Ltd, Various marine and defence contracts

START Date
END Date

Managing development and refurbishment projects within the aerospace and industrial sector, preparing budgets, monitoring actual spend and reporting progress. Chairing project meetings and providing technical assistance to the design team.

  

Branch Manager, Whitbread, not applicable

START Date
END Date

Branch Manager of a busy retail outlet duties included recruitment, training and disciplinary procedures, ordering, stock control, book keeping, banking and control of profit and loss accounts, holding wine tasting sessions and giving talks on history, origin and qualities of the products. 

Contract and Project Controls, Besam Ltd, 1.Construction of Multistoried Buildings

START Date
END Date

Project Controller managing installations of automated doors and associated small works. Responsibilities included modifying the standard range of products to tailor them to customer requirements, placing orders, tracking, progressing delivery, obtaining and reporting daily site progress. 

Ian Watts

I
Ian Watts 👤 Member for 15 years 5 months
First Name
Ian
Last Name
Watts
Professional Since
Oldest experience
Years Experience
35
Telephone Number
07838 248460

              Ian Robert Watts M.C.I.O.B.

Working for Bramall Construction as the sloe planner in the East of England my responsibilities start with the tender, and the preparation of the tender programme, site set up, with the plant and resources required. Once the method of build has been agreed between myself and estimator, we present the findings at the settlement meeting with the heads of departments and MD.

Planner and Senior Planner, Bramall Construction, 140 bed care home, New build mixed use developments, remodeling - £10million. = Soham, Walton Court

I
Ian Watts 👤 Member for 15 years 5 months
START Date

Starting my career as an  apprentice carpenter in 1976 I continued along the route of leading hand, foreman, general foremen, with Bovis Construction then assistant site manager and site manager for Fairview Estates, and for Taylor Woodrow and then Taylor Wimpey contracts manager to production manager.

In 2008 I commenced employment with John Laing Partnership as a Planner, they under took all my training needs though Asta.