UK
Hampshire (EU.UK.HAM)
Assitant Planner, Galliford Try (Infrastructure Division), Southern Water AMP 6
• Use of Primavera P6 systems
• Support the planning function, which involves creating and managing project schedules at a detailed level.
• Work closely with senior management, project teams, design teams and sub-contractors to maintain accurate and up to date data for different stages of projects.
• Track and evaluate progress of live sites and the pre-construction phases
• Produce fully logic linked programmes - pre-construction, tender, project (short term and full programmes).
• Attend meetings to gather/request information relating to programme implications.
• Ensure accurate/time
Assitant Planner, Galliford Try (Infrastructure Division), Southern Water AMP 6
- Use of Primavera P6 systems
- Produce fully logic linked programmes
- Support the planning function
- Creating and managing programmes at a detailed level
PMO Senior Planning Engineer, Arqiva Ltd, IT Transformation programme & roll out of Comms Hubs to UK homes and businesses
800x600
Normal
0
false
false
false
EN-GB
Construction Interface planner, Fluor UK, TCO – FGP – WPMP (Wellhead Pressure Management Project)
This role is to coordinate and maintain the engineering Construction Interface
tracker which is the main multi discipline focal point document for the engineering
team in Farnborough, Almaty and Houston with the construction site in Tengiz,
Kazakhstan.
To maintain good communication between all WBS areas, existing area meetings were
enhansed with additional meetings so that the tracker was up to date and all changes visable for discussion in the weekly review meeting by management and lead engineers.
Any slippages within the multiple P6 schedules had to be challenged by liaising
Gyles Shergold
Position: Primavera P6 Scheduler / Planner Supervisor 2013 - Present
Position: Senior SAP Planner Supervisor 2010 - 2013
Position: T/A Superintendent (Assignment) 2009 - 2010
Position: Multi-Trade Maintenance Supervisor 2007 - 2009
Position: Senior Machinery Planner 2004 - 2007
Position: Assignment: SAP Implementation Team 2001 - 2002
Position: Machinery Reliability Technician 1997 - 2001
Position: Machinery: Technician / Senior Technician 1992 - 1997
Position: Trainee Machinery Technician 1989 - 1992
Senior SAP Planner, ExxonMobil, Fawley Refinery Maintenance
Senior SAP Planning / Senior Machinery Planner / Senior Machinery Planner
Set up a chemical planning team to deal with the massive backlog of notifications requiring planning. Developed and implemented a tracker/evaluation system for the monitoring progress. Set up variants to identify critical SAP notification to give clarity of the precise number in the system. Worked hard with the business teams to review the back log, tag priorities and reduce the numbers. This was highlighted at the end of year review as a site success.
Trained in using GEMS/STRIPS a SAP base system.
Senior Primavera Support Specialist, Exxon Mobil, Fawley Refinery Turnarounds and Events
Senior Primavera P6 Scheduler / Planner Supervisor
Main Responsibilities: Help set up a new Programmes Event Team to undertake small yearly outage which the turnaround team used to undertake. This was initial a three person group made up of a Superintendent, Primavera planner/scheduler and a lead field engineer.
Due to my SAP back ground I was asked to learn Primavera and set up this role as I saw fit.
Angela Obande
I am a versatile and successful Planning/Project Controls Engineer with over seven years’ experience in pro
Planner, Hitachi Rail Europe, TMS
I am a versatile and successful Planning/Project Controls Engineer with over seven years’ experience in pro