Chris Goodman
Lead Programme Planning Engineer at National Grid.
UK
Lead Programme Planning Engineer at National Grid.
Lead Programme Planning Engineer at National Grid. Responsible for a portfolio of Electricity Construction Projects.
SUMMARY OF EXPERIENCE
My most recent position. I was employed by FJ Booth Construction at a new Bio-Mass plant as a site manager, tasked with managing the installation of 127 tons of ducting of 4mm – 6mm rolled mild steel ducting with diameters ranging from 400mm to 2700mm. All welded connections using Bare wire positional MIG welding.
Duties included:
· Planning all the works using, Micro Soft Project Planner.
Hi my name is Lee Gibson. I've always worked in the construction industry (petro chemicle and oil and gas) as a Steel erector and Rigger. In 2006 I was diagnosed with Mutiple Sclerosis wich was ok until 2011 when my started to struggle with my mobility. At the time I was working offshore with a great bunch of guys who helped me with my struggles. I went into the planning of lifts and jobs, until 2016 when it became unsafe for me to work offshore with helicopters and the likes.
Instrumentation and Control engineer working on multiple projects in the petrochemical industry.
Instrument engineer working on design for multiple projects on a chemical plant.
Project Engineer for multiple Projects in the petrochemical and oil and gas industry
Project Engineer on Multiple Projects in the Petro Chemical industry
Planner working in North East England on industrial, petro-chem and housing projects.