Planner, Skanska, Anglian Water @ONE Alliance
P6 and Microsoft Project planner in waste water infrastructure and non infrastructure.
UK
P6 and Microsoft Project planner in waste water infrastructure and non infrastructure.
Competant planning manager with a team of 10 planners reporting
proficient in MSP and P6 (&P3)
just started on my journey into 4d with Synchro
Vastly experienced (old), qualified civil engineer
Studied process engineering (Sewage treatment) with Delft University (via Edx),
Enjoys the development of others.
Planner within WRNI (water recycling non infra-structure (sewage treatment works))
Taking schemes from the client as a confirmed 'need'
through 'solutioneering'
detailed design
build on site
commissioning and testing
and hand back to client
Olu has been working within a collaborative environment at Anglian Water for almost 2 years, demonstrating a strong work ethic and the ability to work within teams to drive continuous improvement and derive value. Olu has been Instrumental in various initiatives across Anglian Water and its Alliance partners and has become a valued team member providing innovation and the support to drive efficiency at programme and portfolio level and accurate reporting for management.
- Forensic Planning on behalf of the client on a £120m Infrastructure project in dispute
- Analysis of as-built programmes
Senior Planner for ASC 6&8 Framework. Previously worked for Barhale plc in the @one Alliance for Anglian Water.
Reporting directly to the Regional Managing Director, I was primarily responsible for preparation of the preliminaries, programming, commercial risk, and technical planning input for tenders, and overseeing the on-site planning of the major projects within the East Anglia and North London area. Business areas targeted cover conventional competitive tendering of traditional and design & build projects valued from £2.5 to £15M, including refurbishment and new-build MOD, University works, restoration of historical or ancient buildings/monuments, retail, and industrial projects.
Project Description
Circa £250m 5 year programme of Anglain Water's most large and complex capital investment projects, including new & upgraded WTW, Upgraded WWTW, New potable mains, and shore repair of existing reservoirs. Projects were managed from concept design through to financial close and benefits realisation, managed under a modified NEC2 contract form.
Role & Responsibilities