DE
Germany (EU.DE)
Project Engineer, Mobilcom GmbH, UMTS Mobile Network
Project Engineer responsible for the integrated planning of the site works to deliver an UMTS network to the operator.
PMO Consultant, BP, Gelsenkirchen redevelopment
BP PMO set-up in Gelsenkirchen, planning and scheduling set-up using Primavera then operation of PMO and project services, including cost; document management; issue and risk; reporting and change control.
Heinrich Genent
Project Management, Earned Value Analysis, S-Curves, Schedule Risk Management, Reporting, Project Controlling, Scheduling, Primavera Administration (P6), MS Project, MS Office, Project Set-up, PMP, Power Generation, Power Plants
Coordinator Acceptance of Work, Uniper Technologies GmbH, 1100MW Coal Fired Power Plant
Coordination of Acceptance of Work of >100 suppliers for the contractor of a power plant project
Internship, RAABE (Klett Group), aSc Timetabling Software
Internship Trainee as a Project Manager Assistant at RAABE (Klett Group), Stuttgart Germany
- Managed and maintained database
Internship, RAABE (Klett Group), aSc Timetabling Software
Internship Trainee as a Project Manager Assistant at RAABE (Klett Group), Stuttgart Germany
- Managed and maintained database
Internship, RAABE (Klett Group), aSc Timetabling Software
Internship Trainee as a Project Manager Assistant at RAABE (Klett Group), Stuttgart Germany
- Managed and maintained database
Internship, RAABE (Klett Group), aSc Timetabling Software
Internship Trainee as a Project Manager Assistant at RAABE (Klett Group), Stuttgart Germany
- Managed and maintained database
System Engineering Intern, Airbus GmbH, New product development
I was working in the Design Office Team for Oxygen Systems, in charge of the mechanical and electrical part of the Oxygen systems for all Airbus aircraft.- Assessing the supplier management system- Creation of expertise reports with all system qualification- Supporting incident/accident investigation and proposing a corrective action- Enhancing the safety level of the fleet on the basis of a local risk assessment
Pagination
- Previous page
- Page 3
- Next page