Andorra (EU.AD)

AD

Susan Brown

S
Susan Brown 👤 Member for 11 years 8 months
First Name
Susan
Last Name
Brown
Professional Since
Oldest experience
Years Experience
22

Background in Management/Finance Accountant, Project Accountant.  Moved into Cost Engineer and then Contract Management followed by Project Controls managing team of Planners, Cost Engineers, Estimators, Document Control, Risk Managment.

Lead Planning Engineer, Thales Engineering, 4LM Underground Upgrade

START Date
END Date
Experience Hours (Planning & Scheduling)
1150
Experience Hours (Cost Management)
350
Experience Hours (Forensic Analysis)
150

I was the lead planning engineer for Thales Group on the £778 million Sub Surface Re-Signaling project on parts of the District, Metropolitan, Hammersmith and City & Circle Lines.

 

Project Planner, Keppel Verolme Rotterdam, Paul B Loyd

START Date
END Date
Experience Hours (Planning & Scheduling)
900

Establishing a resource loaded schedule for the refit of the Paul B Loyd semi sub drilling rig. Consulting internal and external clients to contain the deadline. Reporting progress report Inc. S-curve and schedule.

Project Planner, Arup, P500

START Date
END Date
Experience Hours (Planning & Scheduling)
2000

Project Planner,

Due to the gas exploitation in the Groningen (NL) area, the Neherlands are on of the first country's in the world that experience earthquakes due to human involvement. As project planner for the P500 project, you are responsable for the resurge and implementation planning expanidng from the basic study's to the reinforcement of particular buildings. The schedule is built in Primavera P6 and shared with client and government.

Project Control Consultant , GMH Planning Limited , Mitsubishi Electric Europe B.V - Networks Islington Substation Project & Loondon Underground Infrastructural Renewal Project

START Date
END Date
Experience Hours (Planning & Scheduling)
950
Experience Hours (Cost Management)
950

Responsible for developing a detailed, logic linked, resourced and cost loaded programme that aligns with the submitted Activity Schedule that conforms to the minimum level of detail required within the WBS structure attached. Ensured the programme demonstrates compliance with the sectional completion dates & Contractors time risk allowances.

&

Senior Planning Manager, Morgan Sindall , 1) Infrastructure 2)Building works

S
Susan Brown 👤 Member for 11 years 8 months
START Date
Experience Hours (Planning & Scheduling)
24000
Experience Hours (Cost Management)
40000
Experience Hours (Forensic Analysis)
8000

Multi Million pound Infrastructure portfolio, cradle to grave planning reporting risk analysis resource management EVM, NEC contracts