OBJECTIVE: Senior Planning Engineer
AREA OF EXPERIENCE
• Kritsakorn has 9 years in Planning & Scheduling with experience in Petrochemical, Refining projects. He work in direct FEED, EPC and EPCM project. He was complied with the various construction work include revamp , shutdown and turnaround work. He has ability to control with full function with the programme of work included Primavera6, Milestone Professional and Microsoft Project.
ANALYST / PLANNING ENGINEER, Toyo Thai co.,ltd, LDPE Polyethylene Plant,
2010 to 2012 Planning Engineer Toyo-Thai Corp.,Ltd ,
Vinythai Windmill ABT Project, Rayong Thailand
2007 to 2010 Project control Toyo-Thai Corp.,Ltd
PTT - PTTPE –LDPE Project, Rayong Thailand
• Developing and updating the EPC schedule by using Primavera Project Planner P5.
• Developing detailed schedules and issuance (Three Weeks Look Ahead schedules, 90 days look Ahead Schedules).
• Responsible in Project planner team for detailed and control schedule as per target on Shut down and Turnaround work.
Oil & Gas Senior Planning Engineers - Primavera, Amecfosterwheeler Thailand, Sriracha Umbrella Project
2012 to Present Senior Planning Engineer Foster Wheeler (Thailand) Limited :
SUP Sriracha Umbrella (9m USD)
SBOU Sriracha Biological Oxidation Unit Project (26m USD)
Project , Esso Sriracha Refinery Co.,Ltd
• Project Shutdown Planner , preparation all job pack include for shutdown project.
• Establish and manage planning and control system and in developing and updating master plans across all areas of the project.(Level 1,2,3 and 4)
Client Side Project Control Manager-Thai Oil, Amec Forster Wheeler, SPP Small Power Producer Project
Generate required procdures for project controls and project reporting procedure per client standard requirements
Review contract and bids documents, project scpecifications
Review EPC scehdule and dcouments submission relating to project controls and scheduling
Baseline schedule development and approved work breakdown structures
Establishe progress reporting formats and progress calculations, monthly reporting requitements and control coordination procdures.
Client Side Senior Planner-Esso Thailand, Foster Wheeler Thailand, SBOU Project Exxon Mobil Thailand
Assist EPC eEstablished and develop contract schedule and baseline
Review EPC monthly reports and progress backup
Review and comments EPC project control document procedure and sugges recomedantions
Developed reporting forat for produvtivty and level 4 progress calculation sheets
Monthly analysis of EPC forecast schedule and look ahead plans
Submit customize reports to client monthly
Created and update level 2 management schedule on milstone profressional
Jayson De Guzman
I am a graduate of Bachelor of Science in Civil Engineering with 2 year experienced in civil works, local at private owned company for 6 months & abroad for 18 months at Aktor Al Darwish Company at Doha Qatar.
And more than 10 years experienced in ship repair/ shipbuilding industry mainly involved steel heavy fabrication, inspection and testing. Application of gap/ fitting and welding provisions as required of Classification Society. Familiar on codes & standards such as; IACS, ASTM, AWS D1.1, EEMUA, API, etc.
Hull Engineer, Unithai Shipyard and Engineering Ltd, Shiprepair- Shipbuilding
Detailed Functions (ship repair):
· Coordinate to the in-charge project superintendent/manager to get work specification regarding the project.
· Planning and scheduling of manpower and the availability of materials needed in the project considering the date of completion.
· Review approved plans and working drawings if any new fabrication/ conversion/ modification involved.
Planning Manager, Pinetree Development Services Limited, Andaman Marina and Golf Course
Project involved the strategic planning of a multi-phase resort, marina and golf course development in Southern Thailand.
Prepare strategic EPC schedule, together with detailed design development schedule and permit schedules.
Preparation of development cash flow against strategic programme and assist in the preparation of the ‘Annual Operating Plan’.
Establish and implement planning and safety procedures.