Civil (roads and bridges)

civil site eng. & planning eng., Shib Al Jazirah Contracting Company, Civil (roads and bridges)

START Date
END Date
Experience Hours (Planning & Scheduling)
16000
Experience Hours (Cost Management)
16000

Site Engineer-( January  2009 – September 2015)

 

Project Undertaken: Construction of North West Leg Project

Project Description: An all-new 13 Km. Multilane Dual Carriageway with Service Roads complete with Drainage System, Lighting, Traffic Signage, Vital Appurtenances, etc. The Project also includes seven Diamond Interchanges (pre-stress voided slabs) at major road crossings, and Three Long Wadi Bridges with more than 700 – 40 m. Pre-stress Beams (Wadi Hanifah, Wadi Mahadiyah, and Wadi Ubayer) having a combined length of 2 Km.

Civil Engineer-Scheduler & Cost Estimator, Fulton Hogan, Civil (roads and bridges)

S
Simon Drake 👤 Member for 9 years 9 months
START Date
END Date
Experience Hours (Planning & Scheduling)
200
Experience Hours (Cost Management)
0
Experience Hours (Forensic Analysis)
400

Worked as estimator for a civil contractors - Porject ranging from 1m - 4m

Senior Planner (Project Management Consultant), Driver Trett, Civil (roads and bridges)

START Date
END Date

Working as Project Managment Consultant to the major Road project in the Sultanate of Oman.

Project: New Batinah Expressway

Construction of main carriageway, Interchanges, Wadi Bridges, Underpass Bridges, and Culverts.

Package 4 (KM 136+500 - KM 187+043)

Package 5 (KM 180+000 - KM 221+000)

Package 6 (KM 221+000 - KM 266+000)

Civil Site Engineer, Afcons Infrastructure Limited, Civil (roads and bridges)

START Date
END Date

Responsibilities handled:

 

  • Involved in the execution of the various construction elements of bridges (piles, pile caps, piers, pier caps etc...)
  • Involved in the execution of approach road works to the bridges.
  • Coordination with Clients, Consultants & Sub-Contractors.
  • Preparation of Daily Activity Reports.
  • Preparation of actual progress of activities to given work schedule.
  • Preparation of monthly reconciliation statements of cement and steel.
  • Involved in ISO Works such as Documentati

Civil Site Supervisor, (PMCJV) Pakistan Motorway Contractor Joint Venture., Civil (roads and bridges)

START Date
END Date

 

(PMCJV) Pakistan Motorway Contractor Joint Venture 2002 - 2003.

Responsibilities as Construction Supervisor:

 

·         Supervision of technical terms & checking of site works according to specifications & drawings.

·         Quality control of concrete casting, Formwork, Erection of Steel structure. Verification of concrete mix based on application.

Senior Quantity Surveyor/Contract Administrator, RG Lagman and associates/NGB Construction/Cebarco-WCT Eng'g Berhad/Dhafir Dev't & Contracting/Faithful+Gould/GPD Investments LLC/Technologists Inc./AECOM, Civil (roads and bridges), formula 1 racing circuit

START Date
Experience Hours (Planning & Scheduling)
5750
Experience Hours (Cost Management)
28800

Quantity Surveying & Cost management:
•Cost Estimation & Cost control, Contract Management, Procurement Coordination;
•Prepare BOQ recapitulation;
•Prepare Monthly Financial Affairs Report;
•Prepare and Maintain Interim and Final Quantity Books;
•Check the Contractor’s interim and final pay certificates;
•Evaluate unit rates for new items of works;
•Check joint measurements for interim payments;
•Compute final pay quantities;
•Maintain current as-built drawings as the work progresses;
•Maintain progress schedule and cash flow chart;
•Assist in preparation of Variation Orders.