QUANTITY SURVEYOR, SOUTH WEST ARCHITECTURE, 2B+G+2P+26 HOTEL BUILDING

START Date

Pre Contract Stage:-

 

1.       Prepare a Sketch Stage Report including;

a.       Estimate of the total cost for the works at present prices based on the area, volume or some typical unit

2.       Prepare tender and contract documents as necessary for the surveys, studies or tests,

3.       analyze and report on tenders received

QUANTITY SURVEYOR, SOUTH WEST ARCHITECTURE, 2B+G+2P+26 HOTEL BUILDING

START Date

Pre Contract Stage:-

 

1.       Prepare a Sketch Stage Report including;

a.       Estimate of the total cost for the works at present prices based on the area, volume or some typical unit

2.       Prepare tender and contract documents as necessary for the surveys, studies or tests,

3.       analyze and report on tenders received

Quantity Surveyor, Daito Construction Co. Ltd., Omuta-Saga Bridge

START Date
END Date

As a Quantity Surveyor (1999 to 2001), I was Tasked to handle jobs related to quantifying and tracking project activities for the construction of two span river crossing bridge connecting the city of Omuta, Fukuoka prefecture and Jojima, Saga Prefecture:

§  Quantity Take-Off (from IFC Drawing) and mark-up and record any variance for Claims

§  Prepares and submit quantity appraisal on every activity being done pertaining to civil, Mechanical and electrical Works.