PLANNING ENGINEER

PLANNING ENGINEER, AMEC Design & Management, ACG

START Date

Planning Engineer with more than 6 years of extensive experience in Oil & Gas industry working in Project Control group. Involved in projects from initial conception through construction completion and commissioning, including Brownfield / Greenfield engineering developments. Project types include: front-end engineering and design (FEED), offshore installation and hook-up, topside fabrication, fabrication and assembly oil tanks and flow lines.

Planning engineer, Starstroi LLC, Sakhalin-II Project

START Date
END Date

Performed planning and project control activities for Sakhalin-II Project using Primavera software. The Sakhalin-II Project is the world’s largest integrated oil and gas development. Sakhalin Energy, an affiliate of Gazprom, is the operator of the Sakhalin-II Project. Other participants in the Sakhalin-II Consortium are: Shell is a worldwide group of oil, gas and petrochemical companies; two Japanese trading houses, Mitsui and Mitsubishi.

Planning Engineer, Hasan Juma backer trading & Cont co. LLC, Water Scheme to Ar Rustaq and other villayats

START Date
END Date

1) Planning and preparing projects' schedules using Primavera P3 software.2) Developed micro schedules to accurately track the balance work 3) Applied Fast Tracking & crashing on the schedules to deliver the project to end user4) Co-ordinating with Site Engineer / Sub contractor to give the REALISTIC SCHEDULE fo

Planning Engineer, Tebodin & Partner LLC, Muscat, Upstream Oil & Gas Engineering Projects for PDO, Occidental oman, etc

START Date
END Date

Current Role

Was the focal point of all planning related jobs of the organization. Responsibilities included

Planning Engineer, Jaiprakash Enterprises Ltd., Baglihat Hydro-Electric Project, J & K, India

START Date
END Date
  • Monitoring technical aspects of various structures in the project to ensure quality & timely execution of the project.
  • Monitoring & controlling the progress of works using Primavera Project Planner (V 3.1)
  • Involved in preparation of Monthly Progress Report, Hand-outs, presentations and various other documents of the Project.
  • Coordination with consultant (M/S Lahmeyer International), site and Head office for certain technical and Contractual issues.
  • Contract Interpretation for Time Extension of the Project.

Planning Engineer, SBG - Public Buildings & Airports Division, Sumaishi, Makkah

I
Irfan Khan 👤 Member for 16 years 11 months
START Date

Experience History :-

Worked as a Professional Planner & Scheduler with below mentioned Projects :-

1. Overall Infrastructure Project - Z Road

2. Overall Infrastructure Project - N Road

3. Beach Access Road

4. 270 Villas

5. Industrial Park Grading Package

6. Resort Cove Grading Package

Current Project :-

Emergency Loadging Centre, Sumaishi,  Makkah, Saudi Arabia

Working as a Planning Engineer.

Analyzing & Tracking Progrress with Primavera v. 6.7

Reporting & Cost Controlling.

1.“planning engineer” or “project planner” or, Target Engineering, Barwa Commercial Avenue Type 01 & 02

START Date
END Date

 

Jebel Ali Desalination Plant, Dubai

250 mn

DubaiElectricity and Water Authority

Fisia Italimapianti

132/22 KV Substation, Sadiyath, Abu Dhabi

100mn

Transco

Siemens.