Planner

Planner, Sir Robert McAlpine, Newcastle Building Schools For the Future PFI, Phases 1 & 2

N
Neil Traill 👤 Member for 14 years 3 months
START Date

Construction Planner working on the Newcastle Building Schools for the Future PFI Phase 2. Undertaking all aspects of both planning and programming construction works from tender through to handover.

Planner, Sir Robert McAlpine, Newcastle Building Schools For the Future PFI, Phases 1 & 2

N
Neil Traill 👤 Member for 14 years 3 months
START Date

Construction Planner working on the Newcastle Building Schools for the Future PFI Phase 2. Undertaking all aspects of both planning and programming construction works from tender through to handover.

Planner, Schofield Lothian, RMG A13 JV DBFO Road Claim v TFL

L
Lee Mallek 👤 Member for 21 years 1 month
START Date
END Date
Experience Hours (Forensic Analysis)
2200

Joined Schofield Lothian to gain experience as a Forensic Planner based in Central London.

Slough Borough Council v Dew Pitchmastic, Slough, UK

Worked as the delay analyst for Schofield Lothian providing forensic planning support to the defendant SBC during the refurbishment of a residential tower block. The contractor was requesting an extension of time

Birse Build Ltd v Elliotts Brickwork, Hemel Hempstead, UK

Planner, Rail Link Engineering, Channel Tunnel Rail Link - Section 2

START Date
END Date

Transferred to section 2 of the project in March 2000 within the central group, tasked with the  reporting of progress on the early enabling works and the production of detailed programmes for the engineering disciplines. In December 2000 re-assigned to the St Pancras team in preparation for the commencement of major construction works in July 2001. Continued with the engineering programming with a growing involvement with the construction team as contracts were let. In July 2001 transferred to site offices to monitor, report and do analysis on Contracts 102, 125 and 135.

Planner, Balfour Beatty Utility Solutions, Beauly to Denny 400kV new build OHL construction project

J
John Sims 👤 Member for 15 years
START Date
END Date

Working for Balfour Beatty Utility Solutions in the Power sector, working in and running the planning department which currently consist of a small team to which which contiune to grow during 2012 and onwards.

Our key disiplines include delivering engineering designs and documents to site operations in order for them to progress with new build and refurbishment projects in Overhead Line 132kV, 400kv projects.

Looking after some 50-60 current live projects with a range of 10k to 1.5 million value.

Planner, Rolls-Royce Power Generations, Gas Turbine Power Generation Plants

G
Gary Carter 👤 Member for 15 years 3 months
START Date
END Date

Planner for various Gas Turbine power generation plants inlcuding:

  • Trent GT at Bristol
  • Trent GT at Exeter
  • RB211/HRSG and steam pipeline at Liverpool Docks
  • 3 x Allen 5000 Diesel Engines in BVI
  • Tender planning