Planner, Tyasei, Al Daed Road Project
Preferred position: Senior Planning Engineer
Strengths
Preferred position: Senior Planning Engineer
Strengths
Preferred position: Senior Planning Engineer
Strengths
Preferred position: Senior Planning Engineer
Strengths
Hyder became ‘Preferred Bidder’ for one line of the Riyadh Metro tender, which I produced the design programme. Having achieved this status, I was required to provide significant amendments and additional details to the integrated design programme to match the set dates for construction tasks. This was to define by what dates each station required to have the completed designs to remain on time. To do this I was required to determine which aspects of the design needed to be completed prior to the construction tasks.
I developed Hyder's design programme, with regular meetings with the contractor to determine the critical tasks.
I then imported all other design disiplines programmes to produce an integrated programme for the delivery of a bid programme.
Hyder won the tender.
Planning Engineer
working with differnernt projects.
giving support to different projects
Planning Engineer
working with differnernt projects.
giving support to different projects
Grant Rail
May 05 - Oct 06
Role: Project Planner
Projects: St Pancreas Redevelopment; Jubilee Line Extension
Responsibilities:
GriffinsRail Underground
Nov 06 – Aug 07
Role: Planning Engineer
Projects: South Wimbledon Station; Hyde Park Corner Station; GoldersGreen Station; Leicester Square Station
Responsibilities:
Responsibilities:
Feb 2008 - July 2010
Balfour Beatty Carillion Joint Venture
Role: Planning Engineer
Project: East London Line Rail Project, Balfour Beatty Rail Projects and Balfour Beatty Civil Engineering, in a 50/50 joint venture were responsible with Carillion for railway works involving track, signalling, telecommunications and electrification, as well as major civil engineering works including two large new bridges, new stations and a new depot at New Cross Gate.
Responsibilities: