Forensic Planner, Proplan, Nepean, New Rom 4 Conveyor system at Roy Hill
Build EOT defence framework using monthly contemporaneous Windows analysys methodology.
Forensic Planner
Build EOT defence framework using monthly contemporaneous Windows analysys methodology.
- Assess subcontractors' EOT Claims and prepare rebuttals
- Prepare Coutnerclaims
- Prepare EOT Claims
- Support project control and planning team
- Support Contracts / Legal Counsel team
Syama Redevelopment Project – Gold Project Upgrade in Mali, West Africa.
Forensic Planner, (Specific Assignment), 10/2009 to 12/2009
Engineering delivery Claim preparation with Clayton Utz on behalf of owner. Assignment to introduce “for construction” drawing deliverables into baseline and As-Built schedule.
Maundering Weir Water Treatment Plant – 165,000 Cubic Meters of water per day Water Treatment Plant.
Forensic Planner, (Specific Assignment), 02/2012 to 06/2012
Integrate Bill of Quantity data to progress schedules to assist client in development of Extension of Time claim case due to large change in scope and delay in design
Merredin Power Station Project. – 82MW PowerStation Project in Western Australia.
Forensic Planner, (Specific Assignment – Part time consulting role)07/2012 to 09/2012
Defense EOT claim preparation for client against contractor due to late delivery of equipment
Marandoo Dewatering Project – 24km pipeline with 27 bore pumps, Transfer & booster pump stations in Western Australia.
Forensic Planner, (Specific Assignment) 06/2013 to 03/2014
Preparation of Extension of time claim and support in Mediation process and conclusion
wheatstone village– Chevron Wheatstone Construction Village Buildings & utilities Project. Western Australia.
Forensic Planner, (Specific Assignment), 01/2014 to 03/2014
Preparation of Extension of time claim schedule in “Impacted as Planned” format.
RIO-TINTO Cape Lambert Services Contract – Construction Project of Piping and Cable infrastructure at Point Sampson in Western Australia.
Forensic Planner, (Specific Assignment), 08/2013 to 06/2014
Preparation of Extension of time claim and support in Mediation process and conclusion