Contracts Senior Planning Engineer, Alstom, Route 2020 Metro Rail Dubai
WhWhile assigned to Route 2020 Metro Project, Dubai, I am involved and responsible for performing the following tasks;
WhWhile assigned to Route 2020 Metro Project, Dubai, I am involved and responsible for performing the following tasks;
Reported to Package manager, the aim of this scheme was to deliver a new water supply into birmingham to allow extended planned maintenance shutdowns of the Elan Valley Aqueduct
I helped the team to manage resources and risks to accelerate delivery and also to minimise costs during the planning stage
Senior Planning Engineer Liverpool Waste Water Treatment Works. Involved in many aspects of this £180m project. I had (and still do have ) a particular interest in developing programmes from scratch for process plant, HV transformer swap outs, large 500kW pump changes and software development for many control systems. SCADA
Senior Planning Engineer Liverpool Waste Water Treatment Works. Involved in many aspects of this £180m project. I had (and still do have ) a particular interest in developing programmes from scratch for process plant, HV transformer swap outs, large 500kW pump changes and software development for many control systems. SCADA
Started with GT as a tender planner in their infrastructure division. Originally in rail and later general civils including many coastal defence schemes
Planning engineer at worleyparsons indonesia for Conocophillips Engineering service Contract, Ruby Field Development on Mubadala, etc
Project engineer at Worleyparsons Indonesia for Senoro Gas Development, Total yadana Subsidence Project, etc
Projects includes: ROYAL NAVY QUEEN ELIZABETH CLASS AIRCRAFT CARRIERS Location: Portsmouth, Govan, Tyneside, Merseyside & Rosyth Client: Aircraft Carrier Alliance Main Contractor: Imtech Contract Value: Circa £50 million Scope: Manufacture & Install HVAC & associated equipment Experience of all aspects of Planning Operations associated with the Construction of Process and Utility modules, semi-submersibles and FPSOs’ within the Offshore Oil and Gas industry for a period of sixteen years with system and application knowledge of Primavera P3 and P3e, Artemis 6000, 7000 and 9000 co
Responsible for the development and delivery programmes, maintenance and project valuations for the St Johns Wood 132Kv Sub-Station Switchgear Repacement Works Phases 2 & 3.
Responsible for the maintenance and progress reporting of agreed programmes, contract surveillance and performance of Contracor and Sub-Contracter against aggreed programmes.