CONSTRUCTION/PLANNING ENGINEER

CONSTRUCTION/PLANNING ENGINEER, Ed Zublin AG, Grain Silos Civils Works-Abu Dhabi Mina-UAE; National Marine Dredging Company-Base Facilities-Mussafah Abu Dhabi UAE

START Date

 

PROFESSIONAL SUMMARY

I hold a degree in Civil Engineering from a reputed University in India & has overall 14 years of multifaceted professional experience in a diversified environment of the construction and tender planning for   Buildings, Marine, Nuclear, Power, Energy from Waste/Process industries, Infrastructures, Roads &  Bridges,  of those 14 years,  7 years rigorous experience in Abu Dhabi/Dubai Tenders/Projects and 5+ years valuable working experience in UK.

CONSTRUCTION/PLANNING ENGINEER, NCC, Construction of 718 villas

START Date

Planning, Scheduling, Budgeting, Reporting, Monitoring and controlling the project cost of RO.81M, Construction of 718 villas at Different Location in Quriyat.

  1. To work out the Zero cost (project budget) and fix the project profit margin in consultation with top management & HO.
  2. Prepare construction schedule (Cl.14 and internal) in primavera P6 by ensuring logical sequencing of activity for optimize the resources utilization and reduce the overheads, also work out the S curve.

CONSTRUCTION/PLANNING ENGINEER, Descon Engineering Qatar LLC-Doha-Qatar, Dolphin Energy Ltd-DEL, EPC of New Onshore Gas Plant upstream & Compression Facilities

START Date
END Date
Experience Hours (Planning & Scheduling)
3000
Experience Hours (Cost Management)
50
  • Preparation of Project Schedule for all disciplines like Civil, Mechanical, Electrical and Instrumentation Activities with performed task & milestones.
  • Plan and extract weekly / monthly look a head schedules updates & analysis.
  • Implement all the pre-activities of project based on process units regarding Which Includes Installation of Steel Structure for Main Pipe Rack, Sub Pipe Rack, Equipment Supporting Structure, and Plate Forms & Access Ways.

CONSTRUCTION/PLANNING ENGINEER, Bin Omran Trading & Contracting Company, Roads & Infrastructure

START Date
END Date

i have worked for 6 months and was responsible for progress reporting,

and assisting the manager in detail reporting of the various road n infrastruture works

Permanent Employment Saudi Arabia (AS.SA) £50k to £85k pa plus accomodation and car

CONSTRUCTION/PLANNING ENGINEER, Technip, LNG Project

START Date

ü  Development and deployment of new Construction Methods for Oil and Gas Construction Projects.

ü  Definition and use of Work Packages during Project execution.

ü  Implementation the concept of Workface Planning (WFP) COAA Model (Construction Owner Association of Alberta).

CONSTRUCTION/PLANNING ENGINEER, INDUSTRIALEXPORT, OIL-GAS SEPARATION PLANT AT AKSHABULAK, KAZAKHSTAN

START Date
END Date

CONSTRUCTION/PLANNING ENGINEER at AKSHABULAK, KAZAKHSTAN

Project: OIL-GAS SEPARATION PLANT mainly consisting of: Manifold, Separator Vessel, Scrubber Vessel, Heat Exchangers, Oil Storage Tanks, Pipe Rack, Flare System, Transfer Pump Houses, Booster Pump House, Pig Launcher and Pig Receiver skids, Diesel Generator Sets and Diesel Storage tanks, Water Treatment Plant, Air Compressors, PLC, Fire Fighting facilities and Water Storage Tanks, etc.
Client: RWE-DEA (GERMANY).

Responsibilities:

Supervising, coordinating an

CONSTRUCTION/PLANNING ENGINEER, Soil Foundation Tech, Various Building & Civil Engineering Projects throughout UAE

START Date
END Date
  • Prepared and submitted Baseline and Recovery Programmes
  • Monitoring the Progress of the work as per the schedule
  • Controlling cost in the field of men and material based on budgeted cost
  • Planned different phases of Piling works & Construction works and strictly adopt estimated / budgeted time and cost parameters through project techniques using P3 and MS Project
  • Prepared & Submitted Extension of Time (EOT) Programmes
  • Prepared and presented the bar charts and variance reports to higher management during Tender Stage
  • Rev