planning engineer and cost control, Acestrada, A23 - Scut da Beira Interior Motorway (Ext. 114 Km )

START Date
END Date

As a Planner: Global project planning. Schedule analysis; labour and plant adequacy; key date milestones control; task optimization. Follow up of general works with Microsoft Project Software 

As a Cost controller: Bill of quantities analysis and allocation to sub-contractors; Participation in the re-budgeting of the overall project; 

Planning & Cost Control Manager, Eusebios e Filhos, AZORES ISLAND SCUT (Motorway)

START Date
END Date

– Road construction.

To control, report  and assess all costs related to the construction project. To develop the most appropriate method and sequence of construction operations in a highway project, in conjunction with the site manager.  

Alex Adeeko

A
Alex Adeeko 👤 Member for 13 years 10 months
First Name
Alex
Last Name
Adeeko
Professional Since
Oldest experience
Years Experience
5
Telephone Number
+44 (0) 7817956327

Project Manager/Planner with extensive experience in planning, managing, controlling and delivering strategic projects in the engineering/ transportation infrastructure consultancy sector. Highly knowledgeable in a variety of project management/planning methodologies and analytical tools, including PRINCE2, Oracle Primavera P6 and Microsoft Project.

Assistant Manager - Planning, GMR GROUP, Highway Projects

START Date
END Date
  1. Tracking & Monitoring of L2 & L3 EPC Schedule on the basis of Daily, Weekly Monthly & Quarterly progress reports.
  2. Preparation of S-Curve for different Project.
  3. Cost Control & Cost Analysis
  4. Monitoring progress throughout the construction process and comparing this with the projected schedule of work, and highlight action to meet the schedule, if delayed
  5. Delay analysis for the different Project on the basis of SPI and Current Back Log.
  6. Preparation of MIS Reports for the Top Management on Weekly & Monthly basis.
  7. Gathering

EPC Senior Planner, Larsen & Toubro - ECC, Bangalore Metro Rail Project

START Date
END Date

1.      Overall responsibility of Planning – Viaduct in co-ordination with the Stations team

2.      Schedule preparation, monitoring progress and updating schedule (Initial schedule with MSP and subsequently working on P6 package).

3.      CPM Programme for Viaduct Project.

4.      Updating the Baseline Programme & Recovery Programmes.