Pierre has thirteen years experience in Primavera scheduling, Cost Engineering/Project Controls and Project Management. This includes the lead design scheduler on several heavy civil Design-Build PPP projects, the Project Controls supervisor for a PM/CM engagement, and establishing Project Management Offices at the enterprise and divisional levels.
Finalized, adapted and maintained a 4,500+ activity P6 CPM design schedule for the OhioRiver Bridges Downtown Crossing Project. Project includes a cable-stayed bridge; 100 otherbridges; a roadway re-design across two states; Intelligent Traffic System (ITS) design, aesthetictreatments; as well as geotechnical explorations and reports.
Develop, adapt and maintain the Jacobs portion of the Primavera design schedule for the I-4 Ultimate Improvement Project. Overall, the integrated schedule includes over 25,000 activities covering 140 bridges, 15 major interchanges, aesthetic treatments, landscaping design and 21 miles of reconstructed roadway with dynamic toll pricing.
CONSTRUCTION PROJECT MANAGEMENT PROFESSIONAL “I am an accomplished Construction professional with 10 years infrastructure and building experience in the GCC Region and Turkey. I have worked with two of Region’s leading construction groups and possess a profound understanding and proven record of Project Planning and Execution, Contract Management in diverse Quality Assured environments.