Spencon Planner
Current Role
Current Role
Being engineering manager in a tunnel project, in charge field engineering and planning
Being a site engineer for tunnel concrete lining, and start to use P3 to make schedule Level4 for construction.
Current Role
Responsible for the implementation of various Carriageway Resurfacing and Footway Relay schemes in the London Borough of Hackney since October 2004 as well as the implementation of various Footway Relay schemes in the London Borough of Enfield since October 2005.
Key responsibilities included the following:
• Final measures of Schemes.
• Ensuring Specifications and Standards were adhered to.
• Following up on Health & Safety as well as Environmental issues.
• Liasing with Clients and the Community.