Trent Valley Alliance (Network Rail. Amey Rail) Planner

June 2001-May 2004

Trent Valley Alliance – WCRM LSE (RAIL Birmingham). 2001-2004.

- Primavera P3 – Project and Installation Planning and Reporting inc. TPWS, AWS, OHLE, Signalling associated works. Development and maintenance of robust P3 resource and cost loaded plans for specific sub-projects, running parallel with contractor programmes and interfacing directly with the Master Plan.

- Materials Planning and Control (> £1million).

- Database Design and Development – On Track Site Progress reporting.

- Deputy to Planning Manager and Possession Manager.

Amey Rail Lead Planner

June 2004-Dec 2004

Amey Rail. Level Crossing Conversions (RAIL Belfast). 2004-2004.

- Project Planning and Progress Monitoring.

- Principle Project and Installation Planner.

- Development and maintenance of a stand-alone P3 programme primarily used for progress monitoring, critical path and, cost analysis.

Babcock Rail Planner

• Ensure collation of information from Tender and Project Managers to produce fully resourced tender and project plans within the timescales specified.

• Hold regular reviews with the Project/Contract Manager within his/her assigned area to monitor job deliverables to plan, circulating work-to-lists and action or recovery plans as required, and to provide look ahead information.

• Ensure adherence to laid down procedures for possession management and timely possession implementation.

Network Rail Planner

• Prepare project work breakdown structures and plan in accordance with the requirements of the Guide to Railway Investment Projects (GRIP) to deliver project objectives.

• Ensure the plan is fully resourced and cost loaded and monitor progress to the plan and make changes as required. Develop recovery programme and contingency plans in order to meet changed objectives.

• Input issues into the project’s critical issues risk log. Review risks and ensure the register is updated accordingly.