Oil / Gas / Power

Planner & Cost Controller, TATA POWER CO. LTD., 4000 MW Ultra Mega Power Project by TATA POWER, India

START Date
END Date
Experience Hours (Planning & Scheduling)
1900
Experience Hours (Cost Management)
50
Experience Hours (Forensic Analysis)
950

The job responsibilities include:

Cost Engineer, Chevron Pacific Indonesia, Oil and gas pipelines, power transmission and distribution infrastructure, Integrated power system improvement reliability, Tank repair services for heavy oil operation, On-shore Pipeline Replacement, Upgrading Fa

START Date
Experience Hours (Cost Management)
950

- Develop business plan cycle for 3 years look ahead

- Capital project management portfolio monitoring

- Capital project management schedule predictability monitoring

- Quarterly Report to Management Steering Commitee

- Project control for major capital project

- Facilitator Cost and Schedule Risk Assessment for small capital project

Cost Engineer, Chevron Pacific Indonesia, Oil and gas pipelines, power transmission and distribution infrastructure, Integrated power system improvement reliability, Tank repair services for heavy oil operation, On-shore Pipeline Replacement, Upgrading Fa

START Date
Experience Hours (Cost Management)
950

- Develop business plan cycle for 3 years look ahead

- Capital project management portfolio monitoring

- Capital project management schedule predictability monitoring

- Quarterly Report to Management Steering Commitee

- Project control for major capital project

- Facilitator Cost and Schedule Risk Assessment for small capital project

Cost Engineer, Petro Techindo Utama, Gas Pipeline and Distribution Projects

START Date
END Date
Experience Hours (Cost Management)
1950

- Develop cost estimation for owner estimate (EPC Bid Package)

- Develop master schedule for EPC Bid Package

- Calculate cost estimation for additional/deletion work package

- Review and check contractor's monthly invoice behalf on Owner (Perusahaan Gas Negara)

Senior Planner, Tripatra Engineering, EPC & FEED Project

START Date
END Date
Experience Hours (Cost Management)
500

- Develop WBS and cost estimation for owner estimate EPC Bid Package

- Evaluate contingency requirements

- Integrated project progress, cost performance, and cost forecast report

- Cost monitoring and reporting system in FEED Project

- Develop, maintain, and control integrated schedule FEED with P6 and Ms. Project

Muthukumaran Narasimha Bharatheyar

First Name
Muthukumaran
Last Name
Narasimha Bharatheyar
Professional Since
Oldest experience
Years Experience
45
Telephone Number
+60149386026

JayKashEngineering & Design is founded on 2010 by Mr. Kumaran. JayKash is a company that is providing engineering and services for both the marine, oil and gas industries throughout the market. Our company is located in NegeriSembilan, Malaysia. JayKashhas a dedicated team with good experience and track record in providing design package for Fuel Gas, LP/HP Separator, Heat Exchanger, Electric Heater, Compressor, Pumps, Metering Skids, Produced Water Treatment Package, TEG Package etc. Also provide Structural & Piping Analysis design and calculation.

Piping and Mechanical Design Engineer, Chiyoda, Prosep sdn bhd, Sapura, Offshore and FPSO, Onshore

START Date

JayKashEngineering & Design is founded on 2010 by Mr. Kumaran. JayKash is a company that is providing engineering and services for both the marine, oil and gas industries throughout the market. Our company is located in NegeriSembilan, Malaysia. JayKashhas a dedicated team with good experience and track record in providing design package for Fuel Gas, LP/HP Separator, Heat Exchanger, Electric Heater, Compressor, Pumps, Metering Skids, Produced Water Treatment Package, TEG Package etc. Also provide Structural & Piping Analysis design and calculation.