Turnaround Schedular / Co-ordinator, Chemours Company, Chemical Plant Turnarounds (IPL)
Primavera P6 Turnaround Scheduler for a large chemical plant for 6 years.
Primavera P6 Turnaround Scheduler for a large chemical plant for 6 years.
OBJECTIVE: Senior Planning Engineer
AREA OF EXPERIENCE
• Kritsakorn has 9 years in Planning & Scheduling with experience in Petrochemical, Refining projects. He work in direct FEED, EPC and EPCM project. He was complied with the various construction work include revamp , shutdown and turnaround work. He has ability to control with full function with the programme of work included Primavera6, Milestone Professional and Microsoft Project.
2010 to 2012 Planning Engineer Toyo-Thai Corp.,Ltd ,
Vinythai Windmill ABT Project, Rayong Thailand
2007 to 2010 Project control Toyo-Thai Corp.,Ltd
PTT - PTTPE –LDPE Project, Rayong Thailand
• Developing and updating the EPC schedule by using Primavera Project Planner P5.
• Developing detailed schedules and issuance (Three Weeks Look Ahead schedules, 90 days look Ahead Schedules).
• Responsible in Project planner team for detailed and control schedule as per target on Shut down and Turnaround work.
2012 to Present Senior Planning Engineer Foster Wheeler (Thailand) Limited :
SUP Sriracha Umbrella (9m USD)
SBOU Sriracha Biological Oxidation Unit Project (26m USD)
Project , Esso Sriracha Refinery Co.,Ltd
• Project Shutdown Planner , preparation all job pack include for shutdown project.
• Establish and manage planning and control system and in developing and updating master plans across all areas of the project.(Level 1,2,3 and 4)
Project development and Project management as Dy. General Manager Civil at Project department of K-Electric
I am a civil Engineer, graduated in 1986 from NED University, worked with WAPDA and K-Electric, mostly my experience is at building side like substation, Grid station, commercial and residential buildings, transmission line and gantry foundations, did many remodeling of structure, spaces modification and interior. now a days working as Dy. General Manager of transmission section of K-Electric.
Traniee leave reserve Junior Engineer in WAPDA water and power Wing
MSP & Primavera P6