Waqas Ahmed
Recently joined the Oil & Gas Rig Construction industry as a Graduate Planning Engineer. Looking to develop myself in planning and scheduling using Primavera P6, Excel and MS Project.
Recently joined the Oil & Gas Rig Construction industry as a Graduate Planning Engineer. Looking to develop myself in planning and scheduling using Primavera P6, Excel and MS Project.
A focused professional with 2 years of experience in developing & streamlining systems with proven ability to enhance operational effectiveness and meet operational goals within the cost, time & quality parameters for various piping projects on Water mains and distribution network, Using open trench and trenchless technology (Pipe Jacking & Horizontal Directional Drilling.)
Possess good knowledge on Project Management, Planning, Scheduling, Monitoring, Reporting, Procurement Management, Cost Estimation for portfolio of projects, right from project initiation to commissioning/hand-over includ
Senior Planning Consultant of the PMO team. Liaise with IT to implement a planning environment. Review of initial plans and identify best planning practice to be implemented on the project. Create planning related documents and provide input for various other key documents such as Cost Management Plan.
Senior Planning Consultant of the central PMO team. Validation of the sub-contractor monthly update (schedule, cost, resource, key milestone) to enable a timely update in the central PMO database. Primavera Technical Lead for the team, liaise with management stakeholders and also with contractors to ensure completion of monthly updates and any other ad hoc issues / requests.
* Professional with more than 15 years experience in industrial projects, project management and information technology; * Production Engineering and System Analysis (studying) * PMI member ID 2113141.
2014 (current) – Consórcio QGIT (Queiroz Galvão, IESA e Tecna)
Project: EPC for UPGN (Natural Gas Processing Unit)
Costumer: PETROBRAS – COMPERJ (Itaboraí / RJ)
* Eletrical and instrumentation planning supervisor. Budgeted project value about R$ 1.8 billion
2013 – Schahin Engenharia
Project: Bridges and industrial access
Costumer: PETROBRAS – COMPERJ (Itaboraí / RJ)
* Contract administration and Claims
Project – Construction of LNG Terminal for 2184MW Dabhol Power Project, Maharashtra
Client – Dabhol Power Company
Project Description – 2184 MW combined cycle power project, LNG receiving terminal and re-gasification facilities of 5MMTPA capacity. Scope involved 3x160,000 M3 LNG Storage Tanks, Marine Terminal and 2 km Jetty with LNG unloading facility, Breakwater construction and re-gasification facilities, OSBL piping for natural gas supply to power block and commercial usage.
Projects executed during this period:
1. 300MW Combined Cycle Power Project, Malaysia,
2. Kochi LNG Regasification Project , India,
3. Propane Dehydrogenation Project for HMC Polymer, Thailand
4. Singapore Metro Railway – Downtown Line Stage 3, Singapore