Oil / Gas / Power

Construction Planning & Production Manager , Tecnicas Reunidas, EPC Jazan Refinery and Terminal Project – DHT & HCK Units

START Date
END Date
Experience Hours (Planning & Scheduling)
2000
Experience Hours (Cost Management)
200

Accountable for development of planning & scheduling

Analyzing risk for project scheduling

Graeme Dunlop

First Name
Graeme
Last Name
Dunlop
Professional Since
Years Experience
0
LinkedIn Profile
https://www.linkedin.com/profile/view?id=AAIAABhqnM4ByIgPfw2Yx2noGzO0JNhIdHlPIhw&trk=nav_responsive_tab_profile

Sept 2007 to Present.  Planning Engineer, Reactor Services, AMEC Foster Wheeler, Knutsford

As a senior member who leads this team it is my responsibility to look after my departments’ portfolio of projects for our clients within the energy production industry. My roles and responsibilities include updating progress on projects within Primavera, reporting on project stability on a weekly basis, checking resource loading on projects, reporting on project transactions and bookings and tracking and maintaining project milestones.

Ersan Eren

E
Ersan Eren 👤 Member for 10 years 8 months
First Name
Ersan
Last Name
Eren
Professional Since
Years Experience
0
LinkedIn Profile
https://www.linkedin.com/pub/ersan-eren/22/996/5a

Procurement, Indah Kiat Pulp and Paper, Turbine Generator 2x 150 MW, IKPP Perawang, Riau, coal fired power plant 1 jateng 2x315 MW rembang indonesia

A
Ade Saputra 👤 Member for 10 years 10 months
START Date
END Date

Indah Kiat Pulp and Paper, Tbk Subsidiary Asia Pulp and Paper, (APP.PT)

Business: Pulp and Paper

PROCUREMENT ENGINEER, Apr 2011 – Jan 2014

SAFETY OFFICER, Oct 2012 – Oct 2013

WORK PLANNER, Apr 2011 – Jan 2012

 

Ade Saputra

A
Ade Saputra 👤 Member for 10 years 10 months
First Name
Ade
Last Name
Saputra
Professional Since
Oldest experience
Years Experience
1
Telephone Number
+62 877 9000 0194
LinkedIn Profile
https://www.linkedin.com/profile/view?id=AAMAAAyjBXAByVuR-pv05kI_Gm6RgDbQit4JplA&trk=hp-identity-name

EXPERIACES PROJECT

Mechanical engineer/planning Engineer, SAS International, PT, Removal MRU PetroChina Jambi, Jabung, Indonesia

A
Ade Saputra 👤 Member for 10 years 10 months
START Date
END Date
Experience Hours (Planning & Scheduling)
100
Experience Hours (Cost Management)
100
Experience Hours (Forensic Analysis)
100

SAS Internasional, PT  – Contractors Oil and Gas

Business: EPC Oil and Gas

MECHANICAL ENGINEER, Mar 2014 – June 2015

Ensuring that all drawing, materials, contractor, certificate material, report progress project, prepare schedule.

Duties

·         Prepare schedule project MRU

·         Controlling material, Contractor

Project Planner Turbine, Torishims Guna Engineering, Major Overhoul T/G Unit 500 , Chevron Geothermal Salak, Indonesia

A
Ade Saputra 👤 Member for 10 years 10 months
START Date
Experience Hours (Planning & Scheduling)
300
Experience Hours (Cost Management)
300
Experience Hours (Forensic Analysis)
250

Torishima Guna Engineering, Tbk  –Gas Turbine, Steam Turbine, Pump, Diesel Engine

Business: Engineering Service, Indonesia Company and cooperation with Torishima Pump Japan

 

PROJECT PLANNER TURBINE, June 2015-Present

Project Planner Turbine (Mechanical Rotating), Torishima Guna Enegineering, Major Overhoul T/G Unit 500 Chevron Geothermal Salak, Indonesia

A
Ade Saputra 👤 Member for 10 years 10 months
START Date
Experience Hours (Planning & Scheduling)
350
Experience Hours (Cost Management)
350
Experience Hours (Forensic Analysis)
250

WORK EXPERIENCE

  1. Torishima Guna Engineering, Tbk  –Gas Turbine, Steam Turbine, Pump, Diesel EngineBusiness: Engineering Service, Indonesia Company and cooperation with Torishima Pump Japan

PROJECT PLANNER TURBINE, June2015-Present

PLANNING ENGINEER, Whessoe LGA Gas Technology, Dabhol LNG Project, Depa LNG Tankage Project, Kotri Barrage Rehabilitation Project, Hammerfest LNG Project

START Date
END Date
Experience Hours (Planning & Scheduling)
6500
Experience Hours (Cost Management)
500

During my time at Whessoe, I was employed at the head office on both live contracts and tenders, using Primavera P3, Suretrak & Microsoft Project 98 computer systems, with supporting documentation produced using various Microsoft packages. In this time I have worked on design only projects, EPC projects, tenders and FEED studies.