Dave Beauman
2011 –Present
Senior Planning/Risk Engineer
AMEC Foster Wheeler, Joint Research Centre
Nuclear Decommissioning Unit, Ispra, Italy
Reporting to the Deputy Head of Unit for the Nuclear Decommissioning Unit JRC – Ispra, Italy.
2011 –Present
Senior Planning/Risk Engineer
AMEC Foster Wheeler, Joint Research Centre
Nuclear Decommissioning Unit, Ispra, Italy
Reporting to the Deputy Head of Unit for the Nuclear Decommissioning Unit JRC – Ispra, Italy.
Specialized in Project Control in Oil and Gas and Mining
Planning scheduleing & Project Controls, Quantity Takeoff, Estimation / Reporting
Planning and scheduling turnarounds at a sitelocation in Germany for a worlwide acting chemical company at a site in Germany.
Project Database Lead,
Petrofac International.
Project: Laggan-Tormore, Shetland Islands, United Kingdom.
Amogh Database,
Controlled all project materials relating to site. Mainly Piping and Pipeline. The database also controlled the information relating to weld information, welder qualifications, NDT (None Distructive Testing), Hydro Testing for Pre-Commissioning & Commissioning. I also lead the task for final document handover of the database.
Scheduler in a team dedicated to turnarounds within a world wide acting chemical company.
Inputs the work breakdown structure information in means to assess an accurate forecast on time, resources and cash flow of the project
Accumulates, collects and analyses data and information required for planning
Develop detailed shutdown schedules, identifying critical path activities, overall shutdown durations and resource requirements
Analyze the detailed shutdown plans, identify potential conflicts, deviations and propose solutions to optimize the overall shutdown schedule
Inputs the work breakdown structure information in means to assess an accurate forecast on time, resources and cash flow of the project
Accumulates, collects and analyses data and information required for planning
Develop detailed shutdown schedules, identifying critical path activities, overall shutdown durations and resource requirements
Analyze the detailed shutdown plans, identify potential conflicts, deviations and propose solutions to optimize the overall shutdown schedule
Inputs the work breakdown structure information in means to assess an accurate forecast on time, resources and cash flow of the project
Accumulates, collects and analyses data and information required for planning
Develop detailed shutdown schedules, identifying critical path activities, overall shutdown durations and resource requirements
Analyze the detailed shutdown plans, identify potential conflicts, deviations and propose solutions to optimize the overall shutdown schedule
Inputs the work breakdown structure information in means to assess an accurate forecast on time, resources and cash flow of the project
Accumulates, collects and analyses data and information required for planning
Develop detailed shutdown schedules, identifying critical path activities, overall shutdown durations and resource requirements
Analyze the detailed shutdown plans, identify potential conflicts, deviations and propose solutions to optimize the overall shutdown schedule