Oil / Gas / Power

Assistant Project Manager, CS Total, : QATAR PETROLEUM : Removal & Reinstallation of SRV within various Operational Facilities in the Dukhan Fields.

START Date

At total, I have been in charge of many projects. My main role is to organise, schedule and plan projects for them to meet the requirements.

Area Planning Manager, Transnet Port Terminal, 1. Road Rehabiliation project; 2. Truck staging; 3. 3rd Tipple installation - RBY; 4. Additional Tippler Installation - SLD; 5. Canteen Construction - Maydon Wharf; 7. PE Manganese Refurbishment Pahse 1;

START Date
Experience Hours (Planning & Scheduling)
5200
Experience Hours (Cost Management)
5200
Experience Hours (Forensic Analysis)
0

Project Scope and Time Management

 Utilising Project Life-Cycle Project (PLP) and the integrated Capital Projects Assurance Framework (ICPAF) to:

- Collect requirements

- Identify business needs and reqwuirements

- Determining durations

- Determining Resources

- Creating Work Breakdown Structures (WBS) and Cost Breakdown Structures (CBS)

- Acquire scope freeze date approval

- Sequencing and linking activities

- Creating project schedule

- Performing Critical Path Analysis, including resource loading and smooting.

Hamda AL-Malki

First Name
Hamda
Last Name
AL-Malki
Professional Since
Oldest experience
Years Experience
47
LinkedIn Profile
www.linkedin.com/hamda-al-malki

A Contract Engineer at Oman Power and Water Procurement Company. 

Contract Engineer, Oman Power and Water Procurement Company, Power Generation and Desalination

START Date

- Graduate Engineer at Oman Power and Water Procurement Company from April 2016 to June 2017. I was involved in the Graduate Development Program (GDP) for 14 months. 

- Contract Engineer at Oman Power and Water Procurement Company started from July 2017. 

Graduate Engineer, Oman Power and Water Procurement Company, Independent Power Project & Independent Water Project

START Date
Experience Hours (Planning & Scheduling)
0
Experience Hours (Cost Management)
0
Experience Hours (Forensic Analysis)
0

* Checking/ monitoring Progress Reports

* Checking/ monitoring HSE Complince

* Interfaces managment

* Responding to Claim

Shengli Song

First Name
Shengli
Last Name
Song
Professional Since
Oldest experience
Years Experience
11
Guild Accreditation
GPC Member

Nuclear power plant outage project planning and control

Ofhani Mudau

First Name
Ofhani
Last Name
Mudau
Professional Since
Oldest experience
Years Experience
47

Astute, qualified and experienced Heavy Current Electrical Engineering Professional with strong pedigree in Project Planning, Production Planning and Works Management.

Currently the Site Project Planner at Eskom Rotek Industries responsible for short and long term Site Project Planning.

 

Previously I was the Production Planner (Works Management) at Eskom where my main mandate was long term outage planning.