Senior planner\ project control methodologist, Russian Oil&gas company, Oil field development
Scheduling methodology. MS Project, Primavera. Milestones. Planning. Progress. Progress. jjjj jjjj jjjj jjjj jjj
Scheduling methodology. MS Project, Primavera. Milestones. Planning. Progress. Progress. jjjj jjjj jjjj jjjj jjj
Mohamed Khedr, MSc. PSP.
T: 403-800-1270 | C: 587-888-5234½[email protected]
Senior Planner / Scheduler
Project Controls & Risk Management Specialist
Sr. Planner / Scheduler with over 15 years of experience in the Scheduling and construction of large-Scale, complex projects; including developing and managing a custom-made progress reporting methodology.
Jun 2017- present PT INTI KARYA PERSADA TEKNIK (IKPT)
Assigned as SITE PLANNING AND SCHEDULING ENGINEER for Lumut Balai Geothermal Power Plant Project (55 MW) at Muara Enim, South Sumatera, Indonesia. Client: PT Pertamina Geothermal Energy (Marubeni Corporation).
• Developed detail construction schedule, expand from Project Master Schedule for better work and progress monitoring for construction team and client. Liaised and coordinate with subcontractor and discipline engineer to come up with agreed workable construction schedule.
Sep 2016 – Jun 2017 PT ADHI KARYA (Persero) Tbk.
Assigned as PROJECT CONTROL ENGINEER for 2 x 7 MW Fired Coal Steam Power Plant Project (PLTU) at Tembilahan, Indragiri Hilir, Riau Province, Sumatra Island, Indonesia; Owner: PT.
Sep 2015 – Mar 2016 AMIDA GLOBAL PTE LTD.
Seconded to SIEMENS, Batam Fabrication Yard as SITE PLANNER for Singapore Jurong Cogeneration Project, ExxonMobil.
The scope of works is a substation building with aprox weight 665 MT
Major E&I equipments inside the building are Gas Insulated Switchgear, switchgear, transformers, and overhead bridge crane.
Oct 2014 – Jun 2015 SPENCER OGDEN ENERGY PTE LTD
Seconded to GE OIL AND GAS as SITE PLANNER for Fabrication of Subsea Manifolds and Associated Equipment for the Julimar Project.
The fabrication performed by Sapura Kencana Petroleum Sdn Bhd as the sub-contractor of GE Oil and Gas at Lumut, Malaysia. The scope of works are 2 Manifolds, 3 PLRs,.3 PLETs and temporary stands for fabrication and test and shipping.
• Weekly progress monitoring, updating and analysing of the fabrication schedule.
Primavera P6, Ms. Project, Pert Master, Visual Basic for Application in Excel and Ms. Access.
Feb 2013 – Oct 2014 GLOBAL PROCESS SYSTEMS PTE LTD (Singapore based office).
SENIOR PLANNING ENGINEER
• Involved in development of level 3 schedule and progress measurement for Bukit Tua FPSO EPC Project, monitoring and reporting to client.
• Assist the Proposal Team/Department in preparing Project Schedule for bidding submission.
• Assist in preparing project estimation, tracking and control procedure and continuously look at the ways of improving processes and revise procedure accordingly.
Sep 2012 – Feb 2013 PT SUPRACO INDONESIA
Seconded to MOBIL CEPU LTD.
Oct 2010 – Jul 2012 PT INTI BRUNEL TEKNINDO
Seconded to GE OIL AND GAS as SITE PLANNER for Fabrication of Subsea Manifolds and Associated Equipment for the Gorgon Upstream Project.
• The works are done in PT McDermott Indonesia as the sub-contractor of GE Oil and Gas to do the fabrication. The scope of works are Manifold, PTS and CDU modules and foundations, PLETs, DW and PPI SSPLRs, flowline spools, and well jumpers.