ADGAS Project Controls Engineer
from 1994 - 1996 ABB Sae sadelmi for Power & Desalination Project, Abudhabi
from 1996- 2001 Sharja Oil Refining Company
from 2001- till date ADGAS, Abudhabi
from 1994 - 1996 ABB Sae sadelmi for Power & Desalination Project, Abudhabi
from 1996- 2001 Sharja Oil Refining Company
from 2001- till date ADGAS, Abudhabi
Current Role
Planner on $90 Million Pipeline & Tank Farm.
Planning and Scheduling of KNPC New Oil Pier Onshore and Topside Facilities Project - Kuwait
Planning and Scheduling for Total South Pars Field Development Phase 2&3 Onshore Gas Plant Facilities - IRAN
Worked as Senior Project Control Engineer designated as Project Control Department Head
Managed Planing & Scheduling, Contracts, Material and Document Control Sections
Main areas: Refinery / Oil Gas / Petrochemicals projects in EPCM & EPC role
• Preparation of Daily, Weekly and Monthly Progress Reports for the disciplines such as Structural, Piping, Electrical & Insulation.
• Participating in Weekly and Monthly Progress meetings with the client Project Manager/ Engineers.
• Preparation of Progress monitoring Tools and Work Breakdown Schedule. Assigning Work responsibilities including Equipment & Manpower allocation.
·Creation and Control of Project & Programme Plans (MSP 2000 and Primavera P3e).
·Creation and Control of Issue and Risk Registers.
·Cost estimation and other Bid Pack preparation, EVA and Project Status Reporting.
·Organising and chairing Project and Quality meetings and Acting as Project Lead when required.
·Liaison with Project Leads, Technical Lead Engineers and other Specialists.
Branch Planner then Project Control Lead:
·Creation and Control of Project & Programme Plans (Primavera P3e) with EVA and MIS.
·Liaison with Workpack Managers, Engineering Leads and other Specialists.