petrofac Planner
Current Role
Current Role
Planning ENgineer
• Providing technical support to the tendering process ensuring the correct assessment of all activities and issues and that costs and lead times are realistic and achievable
• Evaluating existing documentation such as tender documents, specifications, contracts and schedules at the beginning of each project and identifying any risks
• Conducting regular visits to each site, monitoring and reporting on progress and minimising any delays
Current Role
Current Role
Responsible for all planning related activities for initially, the Hummingbird FPSO, from fit out in Rotterdam shipyard during construction to Sailaway, Hookup, Commissioning and eventually into production.
Once the Hummingbird platform was completed I then moved on to the Voyageur FPSO project and carried out the same planning work for that project, again from Rotterdam to anchoring in the North Sea. The planning tool used was MS Project and Maximo for maintenace.
Working for Elf Enterprise Oil plc as Senior planner for the Claymore platform. Working in the Field operations department supervising a planner and a technical assistant. Work included maintenace, construction, production, safety, drilling and subsea work scopes. Production of detailed plans for all disciplines for major maintenance and engineering / construction work faces. The planning package utilised was Surtrak
Planner for the AH001 production platform which was a Hess asset. The work included all planning and logistic activities relating to the installation including Operations, Engineering, Maintenance, and Shutdown, utiising MS Project and Primavera P3.
Responsible for production of all engineering and shutdown plans for the Enterprise Oils Nelson platform. The planning package utilise was Controller for Oracle.
Still looking after the Claymore platform as Talisman took over as the operator of the installation.