Gap Insaat Planner
Current Role
Current Role
1990 - 1993 M.W. Kellogg Company Houston, TX
Planner/Scheduler
Usually small petro-chemical and coal related projects. Often of a proto-typical or research and development nature, such as coal gasification, liquefaction, and flue gas scrubbing.
1993 - 1996 Urbanetics Houston, TX
Planner/Scheduler
Various contract positions, domestic and international, often involving training, establishing new systems and instituting new control mechanisms. Assignments varied from offshore platforms to commuter rail systems, together with traditional petro-chemical projects.
1996 - 1998 CDI-Stubs Overbeck Houston, TX
Project Controls Mgr.
Directed the mixed controls team (owner and contractor) on two $30MM chemical support units for an international owner. Was an integral part of the owner’s management team engaged in contract negotiations, contract disputes and settlements, These two projects had the best cost/schedule performance of the $1.8 B expansion project, in spite of confused scope and tardy funding.
2006 - 2007 General Electric - Energy Houston, TX
Sr. Project Engineer
Primary focus was assisting in the development of a 630MW IGCC Reference Plant, together with a re-powering 4x7FAs (tolling contract), and miscellaneous PDPs. Auxiliary functions included structure, pricing, and presentation of Feasibility and pre-FEED studies. Most of this work was largely developmental with few established metrics.
Current Role
Project Services Coordinator for the Goliat Project (FPSO + Upstream + Subsea Facilities + Power Supply) assigned to Eni Norge
Company Mandator E.P.C.M. for “HDT Plant ENAP ACONCAGUA” ACONCAGUA” Planning and Control project in Primavera 3.1 In charge of Monthly report. Executive summary, progress curves, planning schedule and man-hours report. Checking progress control sheet.-