Engineering Equipment Inc. Project Engineer

Oct 1982 to Mar 1984 - Field Engineer

Engineering Equipment Inc.

Westinghouse International Project Corp.

Phil. Nuclear Power Plant, Phase I Bataan, Philippines

Performed planning, scheduling, monitoring and supervision for the construction of ten (10) kilometers access road and installation of main water supply systems to power plant. Works involved earthwork, surveying, pumps installation and construction of pump houses. Similarly, responsible for the fabrication and erection of structural steelworks.



Sep 1980 to Sep 1982 - Quality Control Engineer

Equator Enginering SDN. BHD Planner

•Planning and scheduling and site coordination and schedule monitoring.

•“S” curve and Histogram preparation for KPI monitoring.

•Tonnes estimation of Steel Structure MTO for Addition Claim and Variation order.

•Estimation of Quantity Dia inch of piping MTO to relate to schedule norms.

•Coordinating with Upstream and Downstream project personnel for the flow of work.


Daelim Saudi Arabia Co Ltd Planner

•Preparation of Master schedule on Mechanical and Piping Work including resources, code and work breakdown structure and schedule monitoring.

•Preparation of Weekly Progress Monitoring and Plan forecasting base on agreed schedule revision.

•Schedule analysis of Interfacing Activity and Critical Activity base on Original base line and preparation of recovery schedule.

•“S” curve and Histogram preparation for KPI monitoring.

•Preparation of progress claim data.

Mc Connell Dowell Constructors - South East Asia Planner

•Preparation and updating the overall schedule up to primavera level 4 schedule including recourses and code.

•Preparation of Weekly Progress, Weekly report and Plan forecasting base on Allocated Weights Units.

•Schedule analysis of Interfacing Activity and Critical Activity base on Original base line and preparation of recovery schedule.

•“S” curve and Histogram preparation for KPI monitoring.

•Preparation of Plan mopping and Line Balance method on work sequence and clashes.

•Preparation of progress claim data.

clough Planner

•     Preparation and updating the overall schedule up to primavera level 3 schedule including resources and codes.

•Preparation of revised schedule for commissioning activity.

•Preparation of Weekly Progress, Weekly report and Plan forecasting base on Allocated Weights Units.

•Schedule analysis for Interfacing Activity and Critical Activity base on Original base line and preparation of recovery schedule.

•“S” curve and Histogram preparation for KPI monitoring.

CTCI Corportion Senior Planner

•Preparation and updating the Overall Schedule up to primavera level 3 including recourses and code.

•Preparation of Weekly Progress, Weekly report and Plan forecasting base on Allocated Weights Units.

•“S” curve and Histogram preparation for KPI monitoring.

•Coordinating with Upstream and Downstream project personnel for the flow of work.