Chiyoda Corporation Planner
Current Role
Nuclear Reactor Operations from 1981 including reactor operator license, then Refuel Outage Project Management from 1993, then Entergy goes with Primavera Enterprise 3.5 in 2002, and currently the Entergy Nuclear Fleet Primavera Manager including nine nuclear power plant sites and 11 reactors. P6 version 6.2.1 is current version.
Current Role
♦ WORK EXPERIENCE:
Apr 2009~Todate DESCON ENGINEERING QATAR L.L.C
RAS GIRTAS POWER COMPANY (DESALINATION UNIT)
• Level II and III Planning and Resource Loading using Primavera (P3).
• Formulation of WBS and mapping of BOQ with Cost Centers and WBS numbers.
• Prepared Base Plan independently & on time using P3.
As a Lead Planning, Monitoring & Scheduling Engineer
Current Role
Current Role
Current Role