Oil / Gas / Power
ENGINEERING PLANNER, J.Ray McDermott Asia Pacific, EPCIC ESSO
ENGINEERING PLANNER. Projects involved in Fabrication of Topside, Jacket & Pipeline, and Riser Access Tower. Responsible in planning Drawings with respect to the need in Procurement and Fabrication. Provides reports for each Discipline the progress completed: Productivity, Deliverable Curves per stage of drawing (IDC, IFA, AFD & AFC), Forecasting Manpower (in Histogram), Progress Status for Cost, Time & Resource (CTR), Look Ahead and Late Reports, and, Overall Document Progress Percentage Status Table complete with S-Curves.
Fabrication Planner, Petronas, Topsides, Living Quarters & Jackets
FABRICATION PLANNER. Projects involved in Fabrication of Topsides, Living Quarters & Jackets. Responsible in planning the weekly activities that the project needs. Anticipating possible bottle-necks / critical paths and set priorities needed to get thru; increasing manpower or implementing double-shifts; expediting receivable materials, anticipating the equipments needed, then, coordinate with all disciplines in Project Management Team, on-site engineers and sub-contractors to make my plan happen. Prepares the Weekly & Monthly reports.
Planner
Current Role
Pagination
- Previous page
- Page 1233
- Next page