START Date

 

  1. Understand work scope, quantity and familiar with logical sequences in terms of engineering, manufacturing and construction disciplines.
  2. Conduct field scoping to clarify scope as required.
  3. Understand WBS structure , and work with management and project/maintenance team  in the development of work break down structure for progress measurement, scheduling ,cost estimating and project control.
  4. Prepare and manage overall master schedule integrating work breakdown structure using scheduling software.

Planner Project, PTNNT, New Crane Shop Project

START Date

 

  1. Understand work scope, quantity and familiar with logical sequences in terms of engineering, manufacturing and construction disciplines.
  2. Conduct field scoping to clarify scope as required.
  3. Understand WBS structure , and work with management and project/maintenance team  in the development of work break down structure for progress measurement, scheduling ,cost estimating and project control.
  4. Prepare and manage overall master schedule integrating work breakdown structure using scheduling software.

Planner Project, PTNNT, New Crane Shop Project

START Date

 

  1. Understand work scope, quantity and familiar with logical sequences in terms of engineering, manufacturing and construction disciplines.
  2. Conduct field scoping to clarify scope as required.
  3. Understand WBS structure , and work with management and project/maintenance team  in the development of work break down structure for progress measurement, scheduling ,cost estimating and project control.
  4. Prepare and manage overall master schedule integrating work breakdown structure using scheduling software.

Planning Engineer, SALUM, EARTH DAM

START Date
END Date

Planning Engineer (on site) - Responsible for:

(1) planning and scheduling activities related toan earth dam construction (which belongs to VALE – very large global mining company);

(2)liaising and coordinating with on-site personnel to achieve continuous improvement in meeting quality, environmental, health and safety requirements;

Trainee Planner, Laing O'Rourke Australia, Rio Tinto Cape Lambert Port B

START Date
END Date

Supporting role to senior planner.

Assisted with developement of various reports for various stakeholders.

Updating and maintaining of programme, QMR and other KPI reports.

Assist with weekly progress reporting.

Provide project team with data and information as requested.

Project Planner (SIB Projects For Anglo American), Sightfull - Anglo American, SIB Projects For Anglo American - Platinum, Amandelbult Section

START Date
END Date

Herewith some of the basic tasks I’ve done at the above mentioned company:

  • Attending Tender Meetings (To get information for tender program-schedule)
  • Design Tender Program-Schedule (With minimum detail –baseline program /schedule Level 1-2)
  • Attending Tender Award Meeting (To get information for more detail program/schedule Level 2-3)
  • Attending Site Meeting (To see site layout and getting the final detail )
  • Project Starts Visit Site (Start design a Construction program/schedule level 4-5)
  •  Attending Site M

Project Planner, Masters Splice & Termination, Koepe Winder Electrical Installation, Central Balsting System Installations, Re - Building Mining Shafts(Electrical), Switch Gear , Substations

START Date
END Date

Project Planner  Master Splice & Termination (2009/08/11 - 2010/09/31)

 

 Herewith some of the basic tasks I’ve done at the above mentioned company:

  • Attending Tender Meetings (To get information for tender program-schedule)
  • Design A Tender Program-Schedule (With minimum detail –baseline program /schedule Level 1-2)
  • Attending Tender Award Meeting (To get information for more detail program/schedule Level 2-3)
  • Attending Site Meeting (To see site layout and getting the fin

Project Planner, UGL, Maximo Implementation

START Date

Currently a Project Planner assigned to Coal Mine Prep Plant for a Maximo implemetation.

Wiriting Job Plans based on equipment hierarchy list per OEM recommendations and input from site maintenance.

Creating Work Procedures and PM's based on Job Plans, with routes for inspection and lubrication.

Work Procedures have attachments (drawings,reference material,manhour est.,instructions,safety,parts and material)

Identifying and creating safety critical PM's for input into Maximo.