Project Control Manager for CAMISEA (cancelled-Oil & gas), Project BSN (Coca Cola Bottling Plant), Interbank Building, Sipan Mining (Gold Mining), and project cost & scheduling supervisor ANTAMINA (ProjectCopper Mining) a joint venture between COSAPI & BECHTEL.
Shutdown Planner/Scheduler at Vale Inco Goro Site Mine New Caledonia since July 2009 within the Acid Leaching Plant. Used Programs such as Microsoft Project, Primavera, Elipse and SBF to plan, schedule and track shutdown work.
Responsibilities
• Production planning / scheduling
• Design of POP Displays & Movie Standees
• Preparation of SOPs
• Liaise and purchase raw materials from suppliers
• Lead, train and guide the production team
Costing, Planning, Document Control, Estimating, procurement, contract.
Planning projects since 1996 - at present :- the installation of new mine sites, from the cardumper,Crushing & Screening, through to the load out systems. Experienced in the site erection as well as the commissioning of all works relating to iron ore mining. Previous to this I was working in the petrochemical environment, petroleum, gas acrylates & acids.