Product Engineering Manager, Electronic Automation Ltd, Caravan Industry - Materials Optimisation
Hardware and software design and development for stand-alone industrial and consumer products.
Hardware and software design and development for stand-alone industrial and consumer products.
Planning Enginner covering such diverse project as a R&D, product development, new warehouse builds and maintenance shutdowns
JANUARY 2006 – OCTOBER 2006
Company/Institution: SC TotalSoft SA
Plant place: Bucharest
Position: Planner / Primavera Application / Implementation Consultant / Trainer
Duties:
Programme Planner within a tripartite PMO (Home Office, Fujitsu and Atos), responsible for the integrity, coordination and consolidation of 28 project and workstream plans into the update, reporting and mitigation cycles of programme plans and associated cross-project and external dependencies.
Project Procurment Coordinator / Project Planner / Project Scheduler / Project Controller
In 1999 Paul moved to Bechtel Telecoms as the Principal Planner. He was Responsible for Planning and Cost Control during design, construction and installation of one of the first Pan-European high speed broadband links. This was a 7800 km broadband ring linking the over 20 major cities in Europe including London Paris Brussels Berlin and Amsterdam. It included developing IT facilities in each major city, prefabricated booster stations at 50K intervals and 10 lanes of cable duct and high speed fibre optic including 2 sub sea crossings.
Internationally Certified Software Testing Engineer
I have a rich approximately 4+ years of work Experience in the field of Software Testing/ QA.
Ø I am an ISEB (Information System Examination Board) / ISTQB (International Software Testing Qualifications Board) certified Software Test Engineer.
Ø I am also HP Load Runner VUGEN Certified test engineer.
Project coordinator Project coordinator Project coordinator Project coordinator Project coordinator project coordinator
Working in the programme office updating an MS plan on a periodic basis and generating milestone reports on progress.