Niloy Dey
Key Skills & Areas of Expertise -
- Detail Program Scheduling, Cost & Resource Loading.
- Monitoring & Controlling Schedule & provide forecast.
- Generation of periodic reports, Project Dashboards.
- Preparation of correspondences outgoing, MOM, etc.
- Liaising with project Stakeholders & minimize Risks.
- Delay analysis, (As Planned Impacted, Time Impacts Analysis e
Project and Program Systems Manager, The Jones Payne Group, Sound Insulation
Scheduler for multiple construction project schedules created and maintained on MS Project Server.
Frederick Velasco
Senior Scheduler, Stevens Engineers & Constructors, Multiple Projects
Develop schedules for EPC projects in commercial and civil construction including WBS and resource-loading. Evaluate actual construction progress using CPM and maintain regular schedule updates. Create and maintain schedules in Primavera P6 R15.2 software in a multi-user environment. Conduct field visits to review project status for schedule updates. Perform Earned Value metrics, and provide S-curves and histograms.
Sha Shajihan
23+ years of Project Controls experience covering project lifecycle - from planning to closeout, using Primavera P3/P6 and Microsoft Project, including integrating project management and ERP systems.
Project Controls Analyst, ABB Environmental Services, Environmental Remediation Design
Provided project management services on a $175M Navy environmental remediation contract. Maintained an integrated Project Controls Management System for performance measurement. Performed monthly cost and schedule reporting, including variance analysis.
Cost/Schedule Engineer, Harris Associates, Multiple Projects
Performed Project Controls function for construction and renovation projects. Provided Owners with preliminary cost estimates and project schedules based on conceptual designs. Created logically-driven critical-path schedules in the pre-construction phase. Implemented project procedures interfacing with client systems.
Construction Project Planner / Senior Planner / Forensic Analyst, Arabtec Construction LLC, 97 Luxurious Villas - Sanctuary Falls (JGE-Dubai); 1100 Villas with Infrastructure (Fujairah)
1. Preparation of Baseline Schedule with Resource & Cost Loading
2. Allocating Time Periods for Subcontractor, as per the Maincontractors Shedule and approving their programme of work.
3. Montioring Site Progress and Preparation / Submission of Weekly / Monthly Progress Report
4. Attending Progress Meeting and listing out the Critical / Near Critical activities to Client / Consultant
5. Preparation & Submission of Interim / Final EOT Claims