Civil / Building / E&M

David Hatwell

First Name
David
Last Name
Hatwell
Professional Since
Oldest experience
Years Experience
11
Guild Accreditation
GPC Member
Telephone Number
240-880-4433
LinkedIn Profile
in/david-j-hatwell-0676616/

Aegis founding partner and president, David Hatwell, applies his project controls expertise to create individualized solutions for each client. A respected leader in the field of project controls, he is a sought-after expert in scheduling and dispute resolution.  David has scheduled over $15 billion of projects with a special focus on “mega” projects, such as military and corporate campuses and hospitals. He represents designers, construction managers, owners, general contractors and subcontractors in all phases of construction.

Maxim Dr

M
Maxim Dr 👤 Member for 8 years 11 months
First Name
Maxim
Last Name
Dr
Professional Since
Years Experience
0

Planner of big investment nuclear/decommissioning projects;

Skilled in Primavera P6;

PMP certified.

Matt Dunnett

First Name
Matt
Last Name
Dunnett
Professional Since
Oldest experience
Years Experience
47

I'm a site based civil engineer with broad experience of many aspects of civil engineering and core skill training in the use of Primavera P6.

mirza mohd osama

First Name
mirza mohd
Last Name
osama
Professional Since
Oldest experience
Years Experience
47

vJunior Planning Engineer at AE-ARMA ELECTRPANC, Dubai, U.A.E

v Project – Marsa-al-seef, phase-04  from 01st November2016:

Sub/Site Agent, Costain, Highways and Marine

START Date
END Date

Site Agent

Identify and obtain relevant information to plan the works in accordance with design, drawings, specifications and Employer’s Requirements.

Liaise with statutory authorities and coordinate diversions

Manage the procurement of materials and subcontractors

Determine the methods of working and manage the production of Method Statements, Risk Assessments, Operations Plans and Inspection & Test Plans.

Schedule the works and ensure the compilation of short term and long term resourced programmes and monitor progress

Project Planner, Arup, P500

START Date
END Date
Experience Hours (Planning & Scheduling)
2000

Project Planner,

Due to the gas exploitation in the Groningen (NL) area, the Neherlands are on of the first country's in the world that experience earthquakes due to human involvement. As project planner for the P500 project, you are responsable for the resurge and implementation planning expanidng from the basic study's to the reinforcement of particular buildings. The schedule is built in Primavera P6 and shared with client and government.

Justin Jacobsen

First Name
Justin
Last Name
Jacobsen
Professional Since
Oldest experience
Years Experience
47

 

Project cost estimating, scheduling, and claims analysis

Site visits, inspections and on-site representation

Quality control/quality assurance

Project documentation maintenance and administration

             Analysis and optimization of internal and external processes


 

Lead Consultant, McDonough Bolyard Peck, River Place

START Date
Experience Hours (Planning & Scheduling)
150
Experience Hours (Cost Management)
250
Experience Hours (Forensic Analysis)
50

MBP is one of the premier construction management and program management firms in the country, working closely with the owner, architects, engineers, and other consultants to develop the overall plan for the project. The team provides seamless integration of all parts of the construction process: design, procurement, construction performance and closeout. This allows the owner to manage its construction program without creating permanent staff positions.

 

Responsibilities:

Project Manager , Henok Nigeria Limited , BBC world service trust Studio Project - Department of Mass Communication, Ahmadu Bello University - Customs Service extensions and renovation - Proposed

START Date
END Date
Experience Hours (Planning & Scheduling)
6000
Experience Hours (Cost Management)
6000

Charles managed the design, detailing and construction of the music editing suite (studio) located within the main departmental building seeing it to completion. An exciting project which included acoustics and sound management and has now been completed and commissioned. The project entailed regular site visit to supervise directly, carpenters, ironmongers, bricklayers, and door/windows fabricators. Part of the project requirement was an animated 3d visualisation of the studio.