Senior Project Engineer /Project Scheduler, Bovis Lend Lease, Roche Shanghai
RoSE 1 Phase II
RoSE 1 Phase II
Six Flags China-Riverside
1 Overall schedule for six flag and riverside (Show, Ride, Facade, Area Development, Facility(first phase and second phase infrastructure ,vacuum pre-loading treatment, piling work, foundation, structure, MEP, decoration and facade)
PLANNER
A Self-motivated and energetic professional possess over 10 years of rich experience having executive capacity in varied work environments in leading organizations in Construction industry. Also has managed over 12 projects and multiple clients/project at a time to complete the project on time & cost.
I had served as a team leader of ERP (Oracle) implementation for project module and supply chain module and successfully contributed and having hands on experience.
Exprerienced Site Enginer with a demostrated history of working in the construction industry .Skilled in requirements Agile methodologies,Test automation, test managment, project management .Strong engineering professional graduated from E courses for you(Prince 2 management).working on microsoft project/ primavera p6 EEPM. Planning engineering project control
Site Engineer/assistant planner
Setting out position and level for ground beams and RC slabs.
all general activities about setting out engineering.
Carried out preparation, and the management of construction schedules. primavera p6 EPPM.
Tracked activities and prepared general project reports.
Constructed the Work Breakdown Structure(WBS)
Milestone,Critical Path, Earned value analysis and update as build program.
create and assign Resources, update progress/project. Maintain and Assign baseline.
As Planning Engineer i am using Primavera P6 and lots of Excel
Controls the Planning as well as billing of NH-32 project in the State of Jharkhand, India.
Budget and Project controls of the Project.
Day to day analysis of cost incurred vs expenses of the Project.