Zubeyir Talha Bastem
I have graduated in June 2014. Beginning from then, I have started as Tender and cost engineer and move to project to have senior cost and planning engineer. I got my planning details from my university and incrase my knowledge with time.
Project 2080 Planning & Project Controls
Project Controls Manager, Mace, (various projects) @ all UK
Mace Project Controls Manager
Ensure project controls best practices were understood and followed by the all project teams based at Heathrow and Gatwick.
•Managed multiple teams planning a portfolio of eleven terminal refit and refurbishment projects .
•Trained and coached staff in best practices for planning /scheduling, progress reporting cost control
•Managed progress, cost and KPI reporting analysis reports to the management team and the client.
•Assisted with the production of bids for future work.
Planning \ Project Controls Manager, Otis Elevator Company, (various projects) @ all UK
Otis Elevator Company Planning \ Project Controls Manager
Set up planning/scheduling and project controls department, recruited permanent Planning Manager.
•Installed and supported Primavera P6 software
•Created Primavera P6 Schedules for multiple escalator replacements on London stations.
•Developed system to provide earned value analysis data.
•Trained Project Managers and Engineers in understanding the EVA data.
•Managed Planning & Project Controls including client liaison, management and training of P6 Planners.
Project Controls Manager, Morgan Sindall PLC, (various projects) @ all UK
Morgan Sindall PLC Project Controls Manager Ensure project controls best practices were understood and followed by the all project teams based at Heathrow. •Managed a portfolio of terminal refurbishment projects. •Put in place the project controls strategy, wrote and developed Project Controls Procedure. •Managed progress, actual cost, schedule and cost risk. •Configured Primavera P6 software, set up and maintained Primavera P6 programmes for all contracts including NEC contracts. •Delivered two projects matching the “Perfect Delivery” criteria.
Senior Project Controller, Laing O’Rourke, (various projects) @ all UK
Laing O’Rourke Senior Project Controller Originally recruited as Project Planner later promoted to Project Controls Lead across multiple sites at Heathrow, London and the South East. •Headed a project controls team based at T5 with multiple large scale construction projects. •Provided training staff at all levels in planning, cost collection, progress reporting and earned value analysis at T5 and other sites in the London and South East. •Assisted in the development of the companies own specialist Earned Value Analysis software which was rolled out nationally.
Project Controller, Besam Automatic Doors, (various projects) @ all UK
Besam Automatic Doors Project Controller
Managed supply and delivery contracts, tailored modular system designs to suit individual sites, order parts, liaised with Site Engineers during installation and clients pre and post installation.
Tomas Rivera
I am a Project Management Consultant dedicated to offering the services of my Altek System for Scheduling and Control of High Performance Construction Projects. High performance proyects are in our context, those with a very tight finish date and a high cost if delayed; they are my passion. Our system is especially designed to make sure everyday the project is on time. We use Primavera P6 Professional as part of our Altek System in all our projects.