Civil / Building / E&M

Project control specialist, Fluor Daniel BV, Olefin 2 Kuwait (OL2K) Project

START Date
END Date
Experience Hours (Planning & Scheduling)
2450
Experience Hours (Cost Management)
2450

 

-       Responsible for monthly progress status report of materials procurement, contracts development and engineering manhours.

Senior Planning Engineer, HSIN CHONG CONSTRUCTION (MACAU) LTD., Galaxy Resort and Casino – Phase 2

START Date
END Date
  • Management of the progress measurement system and the reporting set-up for the MEP Works’ Planning and Programme Management scope of the project.
  • See to it that these planning systems are implemented by the various MEP Sub-contractors.
  • Assist the MEP Sub-contractors so that they fully understand the planning methods and their progress reporting are concise and reliable.
  • Submit the required Reports to the Client’s MEP Planning Manager and establish close coordination with him to ensure that MEP Works are monitored and finished based on old or the new re-baselined

Lead/Senior Planning Engineer, Gammon Construction Ltd (Hong Kong), Construction of the Standard Chartered Bank Building, A&A Works for the Hong Kong Jockey Club’s Happy Valley Racecourse

START Date
END Date
  • As Contractor’s Planner, I provide Baseline management, resource loading and analysis, progress update and cash flow integration based on earned value methods.
  • Review overall project status with the Project Management team and recommend corrective action where necessary.
  • Provide support on tender preparation and submission at Head Office.
  • Liaison with the claims team to ensure all contractual matters are maintained and protected.
  • As planner of the PM Team for the project I establish and define any job oriented project control procedures and identify the

PLANNING MANAGER, VinaProjects Ltd. (Vietnam), Construction of the Danang Ocean Villas and Golf Resort Project (Danang, Vietnam)

START Date
END Date
  • Summarize projects status upstream to senior management, highlighting any unresolved major risks and potential overruns
  • To operate a project controls system in accordance with the planning procedures, providing a consistently high level of service.
  • In charge of pre and post contract construction planning works.
  • Assisting with design and  activities relating to the program
  • Informing projects management on potential impacts of changes
  • Analyze Contractor programmes and report procedures

PLANNING MANAGER, VinaProjects Ltd. (Vietnam), Construction of the Danang Ocean Villas and Golf Resort Project (Danang, Vietnam)

START Date
END Date
  • Summarize projects status upstream to senior management, highlighting any unresolved major risks and potential overruns
  • To operate a project controls system in accordance with the planning procedures, providing a consistently high level of service.
  • In charge of pre and post contract construction planning works.
  • Assisting with design and  activities relating to the program
  • Informing projects management on potential impacts of changes
  • Analyze Contractor programmes and report procedures

Planning Engineer, Gammon Construction Limited, LUCITE INTERNATIONAL, ALPHA 1 PROCESSING PLANT PROJECT , CONSTRUCTION of the ITE COLLEGE (WEST) PROJECT

START Date
END Date

·       Support for the Project Manager and other specialty engineers with coordination on project planning, scheduling and program controls

·       Analyze the baseline schedule, check links and critical path, comment on the suitability of the schedule, point out errors and oversights.

·       Tracking all activities on site

Civil / Structural Engineer/maintenance Engineer, NNPC - IDSL, IDSL structural upgrade project

START Date
Experience Hours (Planning & Scheduling)
1850
Experience Hours (Cost Management)
1900

1. prepare bidding documents for structural buildings

2. evaluate technical bidding documents for structural buildings

3. planned and satisfactory execution of all maintenance activities for facilities and structures

4. design structural buildings

5. supervises building projects within the corporation

Civil / Structural Engineer/maintenance Engineer, NNPC - IDSL, IDSL structural upgrade project

START Date
Experience Hours (Planning & Scheduling)
100
Experience Hours (Cost Management)
150

1. prepare bidding documents for structural buildings

2. evaluate technical bidding documents for structural buildings

3. planned and satisfactory execution of all maintenance activities for facilities and structures

4. design structural buildings

5. supervises building projects within the corporation