Negar Somi

N
Negar Somi 👤 Member for 9 years 8 months
First Name
Negar
Last Name
Somi
Professional Since
Oldest experience
Years Experience
5
LinkedIn Profile
https://www.linkedin.com/in/negar-somi/

Director of Planning and PMO, Amoodrah engineering consultancy, IranMall construction complex

N
Negar Somi 👤 Member for 9 years 8 months
START Date
END Date
Experience Hours (Planning & Scheduling)
18550
Experience Hours (Cost Management)
8000
Experience Hours (Forensic Analysis)
3800

PMO leader,Sub-Contractors' Coordinator. Project team coordinator, Site inspector

Director of Planning and PMO, Amoodrah engineering consultancy, IranMall construction complex

N
Negar Somi 👤 Member for 9 years 8 months
START Date
END Date
Experience Hours (Planning & Scheduling)
18550
Experience Hours (Cost Management)
8000
Experience Hours (Forensic Analysis)
3800

PMO leader,Sub-Contractors' Coordinator. Project team coordinator, Site inspector

Alvin Asuncion

First Name
Alvin
Last Name
Asuncion
Professional Since
Oldest experience
Years Experience
23
  • Planning & Scheduling
  • Forensic Delay Analysis
  • Project Supervision
  • Quality Control
  • Quantity Survey/Estimation
  • Structural Designing

Sr. Planning Engineer & Quantity Surveyor, TOA Corporation, Kuwait Naval Base - Breakwater and Cargo Pier Repair Project

START Date
END Date
  • In charge of the preparation of a baseline network analysis programme complete with resource loading. 
  • Recording and reporting the actual progress of the work versus the planned work in P6 and RMS 3.0 system.
  • Monitoring all activities in the project schedule for potential delays, and regularly update claims and variation logs.
  • Prepare the 3 weeks look-ahead schedule for weekly coordination meeting
  • Prepare the monthly progress report and the monthly interim progress payment.
  • Prepare the Time Impact Analysis and other necessary substantiation

Fire Systems Cost Estimator and FAS Design, Saudi Sicli-Jeddah Saudi Arabia., Yanbu Desalination Plant, Medine Hotel, Petrola Rabigh

START Date
END Date
Experience Hours (Cost Management)
5500

Fire Systems Electrical Engineer, 

  • Design of Fire Alarm and Halon 1301 System as per NFPA Codes.
  • Tender and bid preparations, estimates, costing for supply, installation, maintenance of fire suppression (Halon 1301) and fire alarm system.
  • Survey and assessment of actual site condition for pipe routes, supports and orientation of gas cylinders.
  • Calculate volumes of rooms, floor voids and ceiling voids of the room to be protected.

M&E Q.S., Tyco Laboratories Pte. Ltd. Singapore., Suntec City

START Date
END Date
Experience Hours (Cost Management)
5800

Quantity Surveyor, 

  • Valuation of entire electrical works valued over 80 Million Singapore dollars.
  • Creating backup spread sheet, marked drawing to support valuation and progress of establishing star rates for materials sued on the project not in the original contract bill rates.

Site Q.S./Planner, Tyco International Thailand Ltd., Peninsula Hotel, GSS Array, Golden Food Products,for Liebherr Factory

START Date
END Date
Experience Hours (Planning & Scheduling)
5800
Experience Hours (Cost Management)
8750
Experience Hours (Forensic Analysis)
1400

Site based Q.S,

„       Total re-measurement of M&E works for Peninsula Hotel project value at 1.2 Billion Baht. Reconciled measured quantities with James R. Knowles QS representatives.

„       Valuation of M&E work worth 180 Million THB contract value for GSS Array technology. Evaluation two sub contractors’ monthly billing and change orders.

Site Q.S./Planner, Tyco International Thailand Ltd., Peninsula Hotel, GSS Array, Golden Food Products,for Liebherr Factory

START Date
END Date
Experience Hours (Planning & Scheduling)
5800
Experience Hours (Cost Management)
8750
Experience Hours (Forensic Analysis)
1400

Site based Q.S,

„       Total re-measurement of M&E works for Peninsula Hotel project value at 1.2 Billion Baht. Reconciled measured quantities with James R. Knowles QS representatives.

„       Valuation of M&E work worth 180 Million THB contract value for GSS Array technology. Evaluation two sub contractors’ monthly billing and change orders.