Civil / Building / E&M
Sr. Planner, Bam International Abu Dhabi LLC, Museum of the Future
Setting up of detailed baseline program with Primavera P6; prepared BoQ cost breakdown activity wise and loading baseline program activities with cost, quantity and manpower resources; issued start-up programmes to project team; Preparation of engineering (shop drawing, material and method statement) schedules and long lead procurement schedules in line with baseline programme; Setting up of progress measurement system including kpi’s and dashboard; Preparation of S-curves for cash flow; Updating baseline programme and reviewing it with project team; Prepared client progress reports and pre
Davide Pejrani
Office Engineer, SR Constructions, 1-buildings 2-Infrastructure
- Plans prepared for Residential Apartments & Commercial Buildings as per the client requirements.
- Structural Analysis & Design of Concrete Frames, Slabs &Footings using STAAD Pro
- Estimation of Materials required for the Buildings and Client Billing.
/ Construction Project Planner / Senior Planner / Forensic Analyst, Midgard Ltd, North Wharf Gardens project, 335 high-end residential flats, gym and retail areas (£170M)
Senior PlannerFulham Riverside Phase 2 Project, 161 assisted living accommodation and amenity spaces (Pool, spa,restaurant and bars) (£90M) Liaised with external contractors and suppliers to organize the phases and implement a robuststrategy; achieved successful completion of the project milestones within set timeframe andbudget Coordinated with clients and their representatives (architects, engineers and surveyors, Planner);chaired meetings to inform on progress Establish construction project and m
Richard Forsyth
Adam Healy
- Project Management
- Contracts Management
- Procurement
- Risk Management
- Business Cases
- Leadership
John Vooght
PM Civil Engineer with specialist Aviation and water industry knowledge
Year Out Student, Morgan Sindall Infrastructure, Energy Infrastructure Project (£35m)
Carried out setting out duties accurately and on time.Operated and promoted a high standard of health and safety through implementation of company codes.Provided quality assurance through completion of company standard forms.
Pagination
- Previous page
- Page 221
- Next page