Civil / Building / E&M

Framework Coordinator = Senior Planning Engineer, John Martin Construction ( Nuttall John Martin >> Bam Nuttall), Construction Management Framework MAC 9 & 10

P
Paul Ross 👤 Member for 23 years 1 month
START Date
END Date

Framework Coordinator = Planning Engineer at BAM Nuttall [ Edit ]

Privately Held ; Civil Engineering industry

April 2004 – August 2009 (5 years 5 months)

Principal Planning and Temporary Works Engineer, AMEC Marine, Tendering for AMEC Marine

P
Paul Ross 👤 Member for 23 years 1 month
START Date
END Date

Principal Planning and Temporary Works Engineer at AMEC Marine Ltd, part of AMEC [ Edit ]

Civil Engineering industry

August 1996 – October 1997 (1 year 3 months)



Principal Planning and Temporary Works Engineer for AMEC Marine. Planning for tenders, some CAD for barge layouts, piling arrangements with a jack-up barge and breakwater cross sections. Made redundant because of lack of work October 1997. Used SuperProject most of the time.

Senior Engineer, Christiani and Nielsen UK, A variety of tenders and site based projects

P
Paul Ross 👤 Member for 23 years 1 month
START Date
END Date

Senior Engineer at Christiani & Nielsen UK Ltd [ Edit ]

Civil Engineering industry

May 1994 – October 1995 (1 year 6 months)



Senior Engineer with Christiani & Nielsen in Leamington Spa design office, supervision, checking and co ordination of drawings from 5 CAD draftsmen for large wharf in Malaysia, moving onto temporary works and initial planning (including the project plan) for a submerged double pipe pull in Singapore. Joined AMEC in October 1995. (See above). Some planning work in Time-Line package.

Technical Manager after being Senior Engineer, LTA Civil Engineering SA, A variety of tenders and site based projects

P
Paul Ross 👤 Member for 23 years 1 month
START Date
END Date

Technical Manager finally, Senior Engineer at LTA Civil Engineering SA Ltd [ Edit ]

Civil Engineering industry

May 1985 – March 1994 (13 years 11 months)




1994                       Planning, formwork design with LTA in SA, moved to UK (May 1994) to work again for Christiani & Nielsen (see above). Packages mainly Hornet and Time-Line for planning and CadForm for form & falsework design [plus hand design to BS 5975]

Saudi Binladin Group Planner

I was a planner in Al Jamarat Development project and surrounding area in Mina near Al Haram in Makka Al Mukaramah.

The project was a pedstrain multi-floor bridge for pilgrims during Al Haji period.

The project consists of multi-floor walk way bridge + 11 escalators + 2 helipads + bridge ramps + infrastucture + tents + roads.