KBR (Kellogg, Brown & Root) Design & Construction

KBR (Kellogg, Brown & Root) Design & Construction

Ippagunta Shashank

First Name
Ippagunta
Last Name
Shashank
Years Experience
6

 Qualifications/ Certifications: B.E; MMS; PDCM, PMP, PMI-SP, CCE, PSP, EVP, PRINCE2 Practitioner, IPMA Level D

Exp: 18 yrs

Highlights:

Water / Power Resource Projects: Dam Construction in India & Nepal : Almatti Dam & Marsyandi HEP, Nepal

Environmental Projects: Mumbai Sewage Outfalls Projects, Rehabilitation of Collector Tunnels

Transportation Projects: Delhi Metro & Dubai Metro

Industrial Projects: Hadeed Steel Plant, Al-Rajhi Steel Plant, Saudi

KBR (Kellogg, Brown & Root) Design & Construction Planning Engineer

•     Proficient user of Excel, Primavera 3.1 and P6 Advanced Version 6

•     Requirement analysis in terms of labour, materials and equipment (Procurement)

•     Knowledge of project delivery and management procedures; Knowledge of management practices and team working skills

•     Maintain interfaces between the various elements of the overall project

Q2022 Expressway infrastructures , "KBR (Kellogg, Brown & Root) Design & Construction", Q2022 Expressway infrastructures

START Date
END Date
Experience Hours (Planning & Scheduling)
4900
Experience Hours (Cost Management)
4000
Experience Hours (Forensic Analysis)
4250

 

Programme Planning Manager for Q2022 Expressway infrastructures

 

BP Husky Toledo refinery Plant (TFOA-Building ,Infra,  Pipeline ,steel structures and Equipment)  ,Full project control and scheduling ,maintaining Baselines  measuring variances ,Producing KPI’s, Procurement (follow up with vendors ,review their schedules ), ,preparing reports ,Generating S curves ,Coordination ,and Client Presentation.

 

KBR (Kellogg, Brown & Root) Design & Construction Project Controls Engineer

•     Job Title: Senior Quantity Surveyor (Cost Control).

•     Duration: Since November 2007 Till now.

•     Employer: Kellogg Brown & Root International, Inc ( KBR)

•     Client: ALDAR Properties.

•     Project : Yas Island Development.

•     Project Budget: 45 Billion USD.

•     Key Achievements:

     Preparation of Monthly Cost Report to the Client.

     Participating in preparation of Monthly Progress Report.

     Preparation of Cost section in the Monthly Dashboard report.