Foster Wheeler

Foster Wheeler

Shutdown Planner, OTS, Foster Wheeler, Brunei LNG, Nigeria LNG, SABIC PMT, LNG Shutdown, EO-EG.SMPO,LOP De-Bottleneck

START Date
END Date

Projects Control Engineer

Sinopec Shanghai Engineering Company (Sole Proprietorship)

Sole Proprietorship; 1001-5000 employees; Mechanical or Industrial Engineering industry

Shutdown Planner, OTS, Foster Wheeler, Brunei LNG, Nigeria LNG, SABIC PMT, LNG Shutdown, EO-EG.SMPO,LOP De-Bottleneck

START Date
END Date

Projects Control Engineer

Sinopec Shanghai Engineering Company (Sole Proprietorship)

Sole Proprietorship; 1001-5000 employees; Mechanical or Industrial Engineering industry

Site Planning and Project Control Engineer, Foster Wheeler, GS, OIEC COnsortium, South Pars Gas Field, Phases 9 & 10

START Date
END Date
  • Site scheduler and project controller
  • Work with construction crew in order to prepare work front and look ahead plan
  • Assist with scheduling team to estimate and calculate activities duration and physical progress
  • Accomplishment as a qualified planner to reduce disordering between sub-contractors
  • Assist with PMO in fast tracking plans, catch up plans  preparation
  • Data gathering from construction team to prepare project progress reports
  • Update and Progress data bank to monitor the EPC versus baseline through S-curves

SENIOR PLANNER, Foster Wheeler, REFINERY, OIL-GAS SEPARATION PLANT , GAS TURBINE POWER PLANT

START Date
END Date
  • Planning and scheduling projects .
  • Assigning resources, cost data and define relationship to activities Producing.
  • Development Procurement  schedules.
  • Maintenance project master schedules and detailed schedules, resources and costs.
  • Identify all critical paths within a project by using float path analysis.
  • Interface project schedules ,control, monitoring and technical support
  • Create graphics including gantt charts, activity network diagrams, timescale logic Diagrams and histograms.
  • Control budgets, changes and

SENIOR PLANNER, Foster Wheeler, REFINERY, OIL-GAS SEPARATION PLANT , GAS TURBINE POWER PLANT

START Date
END Date
  • Planning and scheduling projects .
  • Assigning resources, cost data and define relationship to activities Producing.
  • Development Procurement  schedules.
  • Maintenance project master schedules and detailed schedules, resources and costs.
  • Identify all critical paths within a project by using float path analysis.
  • Interface project schedules ,control, monitoring and technical support
  • Create graphics including gantt charts, activity network diagrams, timescale logic Diagrams and histograms.
  • Control budgets, changes and