Senior Planning Engineeer, EC Harris, B41 Retrievals Project
Aug 2009-Mar 2011:
Planning Engineer, EC Harris, Sellafield Ltd
EC Harris
Aug 2009-Mar 2011:
Planning Engineer, EC Harris, Sellafield Ltd
Responsible for the preparation of Level 3 Critical Path Networks and Bar charts relating to the procurement of the Phase 3 Concession for the Metrolink light rail network in Manchester. This includes monitoring the interfaces with local authorities and other bodies including Network Rail. The Metrolink system will be expanded by three new lines one of which uses mainly street running, one has major interfaces with the Highways Agency for a motorway crossing and the final one is a replacement of heavy rail services with light rail with resultant Network Rail infrastructure works.
March – May 2007: EC. Harris, London, UK. Successful prosecution of a major infrastructure tender for the 2012 London Olympic Games site using P3e to co-ordinate data from multiple disparate joint venture members to produce the final bid programme. The client was EC Harris and the task involved representing the LVU (Lee Valley Utilities) joint venture bid for the design and construction of the London Olympic Park utilities.