COWI

Project Controls Director, COWI, Silvertown Tunnel, Lower Thames Crossing, High Speed 2

P
Phil Butler 👤 Member for 20 years 9 months
START Date
Experience Hours (Planning & Scheduling)
6000
Experience Hours (Cost Management)
3000
Experience Hours (Forensic Analysis)
1000

Establishing Project Controls team within COWI UK, providing overview and consistency across large projects. Leading Planning within HS2 ASC joint venture

Phil Butler

P
Phil Butler 👤 Member for 20 years 9 months
First Name
Phil
Last Name
Butler
Professional Since
Oldest experience
Years Experience
34

Phil has 30 years Project Controls leadership experience on major/mega projects including High Speed 2, Express Rail Link Hong Kong, Doha Metro, Thameslink, Crossrail, Muscat International and Salalah Airports (Oman), Palm Jumeirah, Ferrari World Theme Park (Abu Dhabi), Hong Kong International Airport, Channel Tunnel Rail Link (HS1) and the Channel Tunnel.

Supervising Engineer, COWI, Drainage and Wastewater Management Project

START Date
END Date

Resposible for Quality Supervision, Progress Montoring & Reporting of a small Earthen Dam, 18 kms long Open Canal Drainage System, 8 kms long Sewerage System, 5 kms long Black Topped Road, Staff Quarter, Office cum Laboratory Building, Workshop, Garage, Parking area and a Wastewater Treatment Plant with 2 Anaerobic Concrete Ponds (Total Volume of 2 ponds: 7500 m3), 9 Aerobic Ponds (Total Volume of 9 ponds: 12,000 m3), Emergency Holding Tank (Volume: 780 m3) and Sludge Drying Beds (4000 m2).