Carillion Construction
Carillion Construction
Senior Planning Manager, Carillion Construction, Various
Senior Planning Manager responsible for planning and Planners on live civil engineering and rail contracts throughout the country.
Contract Planner, Carillion Construction, London 2012 Olympics International Broadcast Centre
International Broadcast Centre and Media Hub Enabling Works (£2.5m)
Contract Planner for design and construct contract under NEC 3 ECC Contract Conditions. Works located within 2012 Olympic Park to provide enabling works for the construction of the international broadcast studios and press offices.
james tuffin
I joined Mowlem in 2001 as Section Engineer, working up to Sub Agent shortly after the Carillion aquisition. After completing a project in Bristol, I was asked to produce some tender programmes for the bid team. It was at this stage that I was approached to work as a Contract Planner on a full-time basis.
Contract Planner, Carillion Construction, Great Yarmouth, Outer Harbour, Scope G
Outer Harbour – Scope G Works (£2.1m)
Tender and Contract Planner for construct only contract under FIDIC Conditions of Contract, 4th Edition. Works located at Great Yarmouth Outer Harbour development to provide around 41,000m² hard-standings to create an operation port area. Contract involved the construction of block paving areas complete with electrical ducting, lighting towers 40m in height, approx.
Principal Planner, Carillion Construction, A12 Witham Bypass Phase 2 Major Maintenance and Improvement Works
A12 Witham Phase 2 Major Maintenance (£7.1m)
Principal Planner for construct only contract under NEC 3 Option C contract conditions. Works located on the A12 trunk-road, Witham, Essex to provide re-surfacing and road realignment utilising 24hr working. Contract involved crack and seat re-surfacing techniques, the provision and erection of 2no.
Principal Planner, Carillion Construction, Abberton Reservoir Project 05 - Reservoir Enhancement
Principal Planner for construct only contract under NEC 2 Option C contract conditions.
Works located at Abberton Reservoir, Layer-de-La-Haye, Essex involving enhancements to the existing reservoir to increase its capacity by 58%. This will be achieved by raising the level of reservoir by approx.
Pagination
- Page 1
- Next page