   Extensive experience in civil engineering construction within the rail and highways industries in the United Kingdom. Strong grasp of Project Management with good track record for successful project completion.

Ian Grant

I
Ian Grant 👤 Member for 16 years 7 months
First Name
Ian
Last Name
Grant
Professional Since
Oldest experience
Years Experience
10

Senior Planning Engineet, BAM Nuttall, Borders Railway

A
Alan Holt 👤 Member for 21 years 9 months
START Date
END Date
Experience Hours (Planning & Scheduling)
4400
Experience Hours (Cost Management)
1000
Experience Hours (Forensic Analysis)
1500

I worked on the £300m Borders Railway Project for 22 months as part of the Project Team managing the Detailed Design / Construction Phase.  I was principally employed on compiling and maintaining an integrated design and pre-construction programme from information collected from four separate design consultancies. 

Bid/Project Planning Engineer, Bam Nuttall, Various

START Date

Planning Engineer Bam Nuttall

Based at Northwich office

Producing progrmmes for tenders containing all the relevant detail as a contract requirement. Assessing optimum phasing and developing methodology as a result of knowledge gained from the requirements within the tender documents and drawings.

Bid/Project Planning Engineer, Bam Nuttall, Various

START Date

Planning Engineer Bam Nuttall

Based at Northwich office

Producing progrmmes for tenders containing all the relevant detail as a contract requirement. Assessing optimum phasing and developing methodology as a result of knowledge gained from the requirements within the tender documents and drawings.

Bid/Project Planning Engineer, Bam Nuttall, Various

START Date

Planning Engineer Bam Nuttall

Based at Northwich office

Producing progrmmes for tenders containing all the relevant detail as a contract requirement. Assessing optimum phasing and developing methodology as a result of knowledge gained from the requirements within the tender documents and drawings.